Do you have any question about this error?
Message type: E = Error
Message class: CM - Task list messages: Material component allocations
Message number: 027
Message text: Selected components are already partially assigned to an operation
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CM027
- Selected components are already partially assigned to an operation ?The SAP error message CM027, which states "Selected components are already partially assigned to an operation," typically occurs in the context of production planning and control, particularly when dealing with production orders or operations in SAP's Production Planning (PP) module. This error indicates that the components you are trying to assign to a specific operation are already partially assigned to another operation within the same production order.
Cause:
- Partial Assignment: The components you are trying to assign have already been partially assigned to another operation. This can happen if some of the components have already been issued or allocated to a different operation within the same production order.
- Multiple Operations: If you have multiple operations in a production order and you are trying to assign the same components to different operations, SAP will prevent this to avoid inconsistencies in inventory and production tracking.
- Incorrect Order of Operations: If the operations are not being processed in the correct sequence, it may lead to this error.
Solution:
- Check Current Assignments: Review the current assignments of the components in the production order. You can do this by navigating to the production order and checking the components assigned to each operation.
- Reassign Components: If you need to assign the components to a different operation, you may need to first unassign them from the current operation where they are partially assigned. This can be done through the production order management screen.
- Adjust Production Order: If the components are needed for multiple operations, consider adjusting the production order to ensure that components are assigned correctly and not duplicated across operations.
- Use the Correct Component: Ensure that you are using the correct components for the operation you are trying to assign. Sometimes, similar components may lead to confusion.
- Consult Documentation: Refer to SAP documentation or help files for specific instructions on managing component assignments in production orders.
Related Information:
CO02
(Change Production Order) or CO03
(Display Production Order) to manage and view production orders and their components.By following these steps, you should be able to resolve the CM027 error and manage your component assignments effectively.
Get instant SAP help. Start your 7-day free trial now.
CM026
Material is already allocated to the operation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CM025
Material & only for collective requirements
What causes this issue? You want to create a default for a component in account assignment or stock generation.System Response In the material maste...
CM028
Alls selected components are already assigned to an operation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CM030
The BOM used up to now is kept
The BOM that has already been processed has not been assigned to the current alternative task list.System Response After you have changed one BOM, y...
Click on this link to search all SAP messages.