Do you have any question about this error?
Message type: E = Error
Message class: CM - Task list messages: Material component allocations
Message number: 030
Message text: The BOM used up to now is kept
After you have changed one BOM, you cannot select another one.
SAve the standard network and call up the standard network again to
process the BOM, as required.
Error message extract from SAP system. Copyright SAP SE.
CM030
- The BOM used up to now is kept ?The SAP error message CM030 indicates that the Bill of Materials (BOM) being used is being retained, which typically means that there is an issue with the BOM status or its validity. This error can occur in various scenarios, such as during production planning, material requirements planning, or when trying to change or delete a BOM.
Cause:
- BOM Status: The BOM may be in a status that does not allow changes or deletions. For example, it might be marked as "locked" or "inactive."
- Valid From/To Dates: The BOM may have specific validity dates, and the current date may fall outside of this range.
- Dependencies: There may be dependent objects (like production orders or purchase orders) that are still referencing the BOM, preventing changes.
- Configuration Issues: There could be configuration settings in the system that are preventing the BOM from being updated or deleted.
Solution:
- Check BOM Status: Review the status of the BOM in the BOM master data. If it is locked or inactive, you may need to unlock it or activate it.
- Review Validity Dates: Ensure that the current date falls within the valid range of the BOM. If necessary, adjust the validity dates.
- Check Dependencies: Look for any dependent objects that may be using the BOM. You may need to close or delete these objects before making changes to the BOM.
- Use Transaction Codes: Use transaction codes like
CS02
(Change BOM) orCS03
(Display BOM) to check the details of the BOM and make necessary adjustments.- Consult Documentation: Refer to SAP documentation or help files for specific instructions related to BOM management.
- Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
CS01
(Create BOM), CS02
(Change BOM), and CS03
(Display BOM).By following these steps, you should be able to identify the cause of the CM030 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CM028
Alls selected components are already assigned to an operation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CM027
Selected components are already partially assigned to an operation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CM050
Select one object
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CM098
Change number collision-BOM item
What causes this issue? You are attempting to change a task list or a standard network with a change number and you also want to change the bill of m...
Click on this link to search all SAP messages.