Do you have any question about this error?
Message type: E = Error
Message class: CKPC - Message for iPPE costing
Message number: 004
Message text: iPPE for material &1 in plant &2 has no costing relevant activities
You attempt to cost material &V1& in plant &v2&.
The iPPE for production version &v3& does not contain any activities
which are costing relevant.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CKPC004
- iPPE for material &1 in plant &2 has no costing relevant activities ?The SAP error message CKPC004 indicates that there are no costing relevant activities for a specific material in a particular plant when using the Integrated Product and Process Engineering (iPPE) module. This error typically arises during the costing process, particularly when trying to perform a cost estimate for a material that lacks the necessary configuration or data.
Cause:
- Missing Costing Relevant Activities: The material in question does not have any activities defined that are relevant for costing. This could be due to missing or incomplete data in the iPPE configuration.
- Incorrect Configuration: The iPPE model may not be properly set up to include the necessary activities for costing.
- Material Master Data Issues: The material master may not be correctly maintained, leading to missing links to costing activities.
- Plant-Specific Settings: The settings for the specific plant may not include the necessary activities or may not be activated for costing.
Solution:
Check iPPE Configuration:
- Go to the iPPE model and verify that the necessary activities are defined for the material.
- Ensure that the activities are marked as costing relevant.
Review Material Master Data:
- Check the material master data for the specific material in the plant. Ensure that all relevant views (like Costing, Basic Data, etc.) are properly maintained.
- Make sure that the material is assigned to the correct valuation class and that the costing variant is correctly set up.
Define Costing Relevant Activities:
- If there are no costing relevant activities, you may need to define them in the iPPE model. This can involve creating or modifying existing activities to ensure they are included in the costing process.
Check Plant-Specific Settings:
- Review the plant-specific settings to ensure that they are configured to allow for costing activities. This may involve checking the configuration in the controlling area and ensuring that the necessary settings are activated.
Run Costing Again:
- After making the necessary adjustments, attempt to run the costing process again to see if the error persists.
Related Information:
CK11N
(Create Cost Estimate) or CK40N
(Mass Costing) to perform costing activities.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in costing and iPPE configurations.
Get instant SAP help. Start your 7-day free trial now.
CKPC003
iPPE for mat. &1 in plant &2 has no costing relevant material components
What causes this issue? You attempt to cost material &V1& in plant &v2&. The iPPE for production version &v3& does not contai...
CKPC002
iPPE for production version &3 is inconsistent for material/plant &1 / &2
What causes this issue? You cannot cost the iPPE for production version &V3& for material &V1& in plant &V2& as the iPPE in n...
CKPC005
Joint production not supported in costing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKPRCH000
System error: Entry &1 &2 &3 is not in table &4
What causes this issue? Material &v1& in valuation area &v2& (valuation type &v3&) is missing in table &v4&.System Re...
Click on this link to search all SAP messages.