Do you have any question about this error?
Message type: E = Error
Message class: CKPC - Message for iPPE costing
Message number: 003
Message text: iPPE for mat. &1 in plant &2 has no costing relevant material components
You attempt to cost material &V1& in plant &v2&.
The iPPE for production version &v3& does not contain any material
components that are costing relevant
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CKPC003
- iPPE for mat. &1 in plant &2 has no costing relevant material components ?The SAP error message CKPC003 indicates that there are no costing relevant material components for a specific material in a given plant when using Integrated Product and Process Engineering (iPPE). This error typically arises during the costing process, particularly when trying to perform a cost estimate for a product that is expected to have associated components.
Cause:
- Missing Components: The material in question does not have any components defined that are relevant for costing. This could be due to the absence of a bill of materials (BOM) or the components not being marked as costing relevant.
- Incorrect Configuration: The iPPE configuration may not be set up correctly, leading to the system not recognizing the components as costing relevant.
- Material Master Data Issues: The material master data may not be complete or correctly maintained, leading to missing links between the material and its components.
- Costing Variant Settings: The costing variant used may not be configured to include the necessary components for costing.
Solution:
- Check BOM: Ensure that a valid BOM exists for the material in the specified plant. If it does not exist, create or maintain the BOM to include the necessary components.
- Review Component Settings: Verify that the components in the BOM are marked as costing relevant. This can be done in the BOM details where you can check the costing relevance of each component.
- Material Master Data: Review the material master data for the material in question. Ensure that all necessary views (especially the costing view) are properly maintained.
- Costing Variant Configuration: Check the settings of the costing variant being used. Ensure that it is configured to include the relevant components for costing.
- Run Costing Again: After making the necessary adjustments, attempt to run the costing process again to see if the error persists.
Related Information:
CS01
(Create BOM), CS02
(Change BOM), CS03
(Display BOM), and CK11N
(Create Cost Estimate) to manage BOMs and costing.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in costing and iPPE.
Get instant SAP help. Start your 7-day free trial now.
CKPC002
iPPE for production version &3 is inconsistent for material/plant &1 / &2
What causes this issue? You cannot cost the iPPE for production version &V3& for material &V1& in plant &V2& as the iPPE in n...
CKPC001
No suitable iPPE found for material &1 in plant &2
What causes this issue? The system attempted to find a valid iPPE for material &V1& in plant &V2& at effective date &V3& and ...
CKPC004
iPPE for material &1 in plant &2 has no costing relevant activities
What causes this issue? You attempt to cost material &V1& in plant &v2&. The iPPE for production version &v3& does not contai...
CKPC005
Joint production not supported in costing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.