Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CKMLWIP - WIP Price Determination
Message number: 510
Message text: Activity type &1 was excluded from processing
Activity type &v1& was excluded from processing as it's
<DS:DE.CK_MLSTAT>material ledger status</> could not be determined.
No data will be created for this activity type.
Check the relevance of this activity type for the report.
Error message extract from SAP system. Copyright SAP SE.
CKMLWIP510
- Activity type &1 was excluded from processing ?The SAP error message CKMLWIP510 indicates that a specific activity type (denoted as &1) has been excluded from processing during the execution of a transaction related to Material Ledger or Work in Progress (WIP) calculations. This error typically arises in the context of the Material Ledger (ML) and can affect the valuation of inventory and the calculation of costs.
Cause:
- Activity Type Configuration: The activity type may not be properly configured in the system. It could be set to inactive or excluded from the relevant cost center or internal order.
- Cost Center Assignment: The activity type might not be assigned to the cost center or internal order that is being processed.
- Master Data Issues: There may be issues with the master data related to the activity type, such as missing or incorrect settings in the controlling area or cost center.
- Period Closing: The error can also occur if the period is closed for the activity type, preventing any further processing.
Solution:
Check Activity Type Configuration:
- Go to the configuration settings for activity types in the SAP system (Transaction code: OAYB or OAKD).
- Ensure that the activity type is active and properly configured for the relevant controlling area.
Verify Cost Center Assignment:
- Check if the activity type is assigned to the correct cost center or internal order.
- Use Transaction code: KS01 (Create Cost Center) or KS02 (Change Cost Center) to verify the assignment.
Review Master Data:
- Ensure that all necessary master data related to the activity type is complete and accurate.
- Check the settings in the controlling area and ensure that the activity type is included in the relevant cost element.
Check Period Status:
- Verify if the period for the activity type is open for posting. If the period is closed, you may need to reopen it or adjust your processing accordingly.
Consult Documentation:
- Review SAP documentation or notes related to the specific error message for any additional insights or updates.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting SAP Notes for further assistance.
Related Information:
By following these steps, you should be able to identify the root cause of the CKMLWIP510 error and implement the necessary solutions to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
CKMLWIP509
Cost estimate number &1 was excluded from processing
What causes this issue? Cost estimate number &v1& (with reference to a material component) was excluded from processing as it's <DS:D...
CKMLWIP508
Component &1 was excluded from processing
What causes this issue? Component &v1& was excluded from processing as the <DS:DE.CK_MLSTAT>material ledger status</> could not b...
CKMLWIP511
Object number &1 (activity type) was excluded from processing
What causes this issue? Object number &v1& (with reference to an activity type) was excluded from processing as it's <DS:DE.CK_MLSTAT...
CKMLWIP512
Cost estimate number &1 was excluded from processing
What causes this issue? Cost estimate number &v1& (with reference to an activity type) was excluded from processing as it's <DS:DE.CK...
Click on this link to search all SAP messages.