How To Fix CKMLWIP512 - Cost estimate number &1 was excluded from processing


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CKMLWIP - WIP Price Determination

  • Message number: 512

  • Message text: Cost estimate number &1 was excluded from processing

  • Show details Hide details
  • What causes this issue?

    Cost estimate number &v1& (with reference to an activity type) was
    excluded from processing as it's <DS:DE.CK_MLSTAT>material ledger
    status</> could not be determined.

    System Response

    No data will be created for this cost estimate number.

    How to fix this error?

    Check the relevance of this cost estimate number for the report.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CKMLWIP512 - Cost estimate number &1 was excluded from processing ?

    The SAP error message CKMLWIP512 indicates that a specific cost estimate (identified by the number &1) was excluded from processing during a cost estimate run, typically in the context of Material Ledger or Inventory Management. This error can arise due to various reasons, and understanding the cause is essential for resolving the issue.

    Causes:

    1. Cost Estimate Status: The cost estimate may have a status that prevents it from being processed. For example, it might be marked as "locked" or "not released."
    2. Inconsistent Data: There may be inconsistencies in the data related to the cost estimate, such as missing or incorrect master data (e.g., material master, BOM, routing).
    3. Costing Variant Issues: The costing variant used for the cost estimate may not be configured correctly or may not allow for the processing of certain cost estimates.
    4. Period Closing: The period for which the cost estimate is being processed may be closed, preventing any changes or processing of cost estimates.
    5. Material Status: The material associated with the cost estimate may have a status that restricts processing (e.g., "blocked" or "inactive").

    Solutions:

    1. Check Cost Estimate Status: Review the status of the cost estimate in the system. If it is locked or not released, take the necessary steps to unlock or release it.
    2. Validate Data: Ensure that all relevant master data (material master, BOM, routing) is complete and accurate. Correct any inconsistencies found.
    3. Review Costing Variant: Check the configuration of the costing variant being used. Ensure it is set up to allow processing of the specific cost estimate.
    4. Open Period: Verify that the accounting period is open for processing. If it is closed, you may need to open it or wait until the next period.
    5. Material Status Check: Confirm that the material is not blocked or inactive. If it is, update the material status to allow processing.

    Related Information:

    • Transaction Codes: You may use transaction codes like CK11N (Create Cost Estimate), CK40N (Change Cost Estimate), or CKMLCP (Material Ledger Closing) to investigate and manage cost estimates.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to the CKMLWIP512 error.
    • Documentation: Review SAP documentation on Material Ledger and Costing to understand the implications of cost estimates and how they are processed.

    If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or refer to SAP community forums for additional insights.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author