How To Fix CKMLLA000 - The plan price for activity type &1 was changed


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CKMLLA - Message for Activity Update in Quantity Structure

  • Message number: 000

  • Message text: The plan price for activity type &1 was changed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CKMLLA000 - The plan price for activity type &1 was changed ?

    The SAP error message CKMLLA000 indicates that the plan price for an activity type has been changed, which can affect the costing process in the system. This message typically arises in the context of Material Ledger and Costing in SAP, particularly when dealing with actual costing and the integration of planned and actual prices.

    Cause:

    1. Change in Plan Price: The primary cause of this error is that the planned price for a specific activity type has been modified after the initial costing run. This can happen due to updates in the cost center planning or changes in the activity type settings.
    2. Costing Run Issues: If a costing run is executed and the plan price for an activity type is altered during or after the run, it can lead to inconsistencies in the data.
    3. Data Consistency: The system expects consistency between planned and actual prices, and any changes can trigger this error.

    Solution:

    1. Review Changes: Check the change logs for the activity type to understand what changes were made to the plan price. This can be done through transaction codes like CK11N (Create Cost Estimate) or CK40N (Costing Run).
    2. Re-run Costing: If the plan price has been changed, you may need to re-run the costing process to ensure that the new plan price is taken into account. Use transaction CK40N to execute the costing run again.
    3. Adjust Planning: If the change in plan price was not intended, you may need to revert the changes in the planning settings for the activity type.
    4. Check Configuration: Ensure that the configuration for the activity types and cost centers is set up correctly. This includes verifying the settings in the controlling area and ensuring that the activity types are properly assigned to the relevant cost centers.
    5. Consult Documentation: Refer to SAP documentation or notes related to this error message for any specific recommendations or patches that may address the issue.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CK11N, CK40N, and others related to costing and planning.
    • SAP Notes: Check SAP Notes for any known issues or updates related to this error message. SAP frequently releases notes that provide solutions or workarounds for specific errors.
    • User Roles: Ensure that users have the appropriate roles and authorizations to make changes to plan prices and execute costing runs.
    • Testing: After making changes, conduct thorough testing to ensure that the costing process works as expected and that no further errors arise.

    By following these steps, you should be able to resolve the CKMLLA000 error and ensure that your costing processes in SAP are functioning correctly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant