Message type: E = Error
Message class: CKMLAVR - Message Class for Cumulation and Revision
Message number: 604
Message text: Routing plan data of production order &1 incomplete
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CKMLAVR604
- Routing plan data of production order &1 incomplete ?The SAP error message CKMLAVR604 indicates that the routing plan data for a specific production order is incomplete. This error typically arises during the execution of a production order in the context of Material Ledger or when performing actual costing.
Cause:
The error can be caused by several factors, including:
Missing Routing Information: The production order may not have the necessary routing information defined in the system. This could be due to missing or incomplete routing data in the master data.
Incomplete Work Center Data: The work centers associated with the routing may not have been fully defined or may be missing key information.
Incorrect Configuration: There may be configuration issues in the production planning or costing settings that prevent the system from retrieving the necessary routing data.
Changes in Master Data: If there have been recent changes to the routing or work center data, it may not have been updated correctly in the production order.
Solution:
To resolve the CKMLAVR604 error, you can take the following steps:
Check Routing Data:
- Go to the routing transaction (e.g., CA03) and verify that the routing for the material associated with the production order is complete and correctly defined.
- Ensure that all operations and sequences are properly maintained.
Verify Work Center Information:
- Check the work centers used in the routing (transaction CR03) to ensure they have all required data, including capacities, cost centers, and valid periods.
Review Production Order:
- Open the production order (transaction CO03) and check if the routing is assigned correctly. If not, you may need to reassign the correct routing.
Check Configuration Settings:
- Review the configuration settings related to production planning and costing to ensure they are set up correctly.
Recreate or Update the Production Order:
- If the above steps do not resolve the issue, consider recreating the production order or updating it to pull in the latest routing data.
Consult Documentation:
- Refer to SAP documentation or notes related to this error message for any specific guidance or patches that may address the issue.
Related Information:
Transaction Codes:
SAP Notes: Check SAP Notes for any known issues or fixes related to this error message.
Material Ledger: If you are using Material Ledger, ensure that all necessary settings and data are correctly maintained.
User Authorizations: Ensure that the user has the necessary authorizations to view and edit routing and work center data.
By following these steps, you should be able to identify and resolve the issue causing the CKMLAVR604 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
CKMLAVR603
Routing plan data of plan order &1 incomplete
What causes this issue? The task list data for planned order &v1& (BOM, task list or production version) is not contained in the order and co...
CKMLAVR602
Plan order &1 has not been scheduled yet
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKMLAVR605
Error when reading/creating name group for &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKMLAVR700
Numerical overflow: Production plan quantity has more than 10 characters
What causes this issue? Numerical Overflow: The production plan quantity cannot contain more than ten digits in the basic unit of measure.System Resp...
Click on this link to search all SAP messages.