Do you have any question about this error?
Message type: E = Error
Message class: CKMLAVR - Message Class for Cumulation and Revision
Message number: 603
Message text: Routing plan data of plan order &1 incomplete
The task list data for planned order &v1& (BOM, task list or production
version) is not contained in the order and could not be read. This
planned order will, therefore, not be included in the production plan.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
The order may not have been scheduled properly, so that the production
control data has not been entered. Schedule the order or manually
maintain the required data.
Error message extract from SAP system. Copyright SAP SE.
CKMLAVR603
- Routing plan data of plan order &1 incomplete ?The SAP error message CKMLAVR603 indicates that there is incomplete routing plan data for a plan order in the system. This error typically arises during the execution of a process that requires complete routing information, such as when performing a material cost estimate or during production planning.
Cause:
The error can occur due to several reasons:
- Missing Routing Information: The routing data for the specific plan order is incomplete or missing. This could be due to the routing not being maintained properly in the system.
- Incorrect Configuration: The configuration settings for the routing or the production process may not be set up correctly.
- Plan Order Issues: The plan order itself may not have been created correctly, or it may not be linked to the appropriate routing.
- Master Data Issues: There may be issues with the master data related to the material, such as missing or incorrect BOM (Bill of Materials) or routing entries.
Solution:
To resolve the CKMLAVR603 error, you can take the following steps:
Check Routing Data:
- Go to the routing transaction (e.g., CA03) and check if the routing for the material associated with the plan order is complete.
- Ensure that all necessary operations, work centers, and sequences are defined.
Maintain Routing:
- If the routing is incomplete, you may need to create or update the routing data. Ensure that all required fields are filled out correctly.
Verify Plan Order:
- Check the plan order (transaction CO41 or CO02) to ensure it is correctly linked to the routing. If necessary, recreate the plan order with the correct routing.
Check Master Data:
- Verify that the material master data is complete and that the BOM and routing are correctly assigned to the material.
Consult Documentation:
- Review SAP documentation or help files related to routing and plan orders for additional guidance.
System Configuration:
- If the issue persists, consult with your SAP Basis or configuration team to ensure that the system settings are correct and that there are no underlying configuration issues.
Related Information:
By following these steps, you should be able to identify and resolve the issue causing the CKMLAVR603 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
CKMLAVR602
Plan order &1 has not been scheduled yet
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKMLAVR601
No mixing ratio could be created for material &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKMLAVR604
Routing plan data of production order &1 incomplete
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKMLAVR605
Error when reading/creating name group for &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.