Message text: Plan order &1 has not been scheduled yet
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CKMLAVR602
- Plan order &1 has not been scheduled yet ?The SAP error message CKMLAVR602 indicates that a plan order has not been scheduled yet. This error typically arises in the context of production planning and control, particularly when dealing with material requirements planning (MRP) and production orders.
Cause:
- Order Not Scheduled: The primary reason for this error is that the plan order has not been scheduled. This can happen if the scheduling process has not been executed for the order.
- Missing Scheduling Parameters: There may be missing or incorrect scheduling parameters in the order or in the configuration settings.
- Status of the Order: The order might be in a status that does not allow it to be scheduled (e.g., if it is in a "created" status and not yet released).
- Dependencies on Other Orders: The plan order may depend on other orders or processes that have not been completed.
Solution:
- Schedule the Order: Go to the transaction code for scheduling (e.g., CO02 for changing production orders) and manually schedule the plan order. Ensure that all necessary parameters are set correctly.
- Check Order Status: Verify the status of the plan order. If it is not released, release it first before attempting to schedule.
- Review Scheduling Parameters: Check the scheduling parameters in the order and ensure they are correctly set. This includes lead times, production versions, and any other relevant settings.
- Run MRP: If applicable, run the Material Requirements Planning (MRP) process to ensure that all dependent orders and requirements are considered.
- Check Dependencies: Ensure that any dependent orders or processes are completed or scheduled as needed.
Related Information:
By following these steps, you should be able to resolve the CKMLAVR602 error and successfully schedule your plan order.
Get instant SAP help. Start your 7-day free trial now.
CKMLAVR601
No mixing ratio could be created for material &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CKMLAVR600
Material &1 &2 still not included (controlling level plant/material)
What causes this issue? Material &v1& &v2& is not included in the valuated production plan, as the controlling level <LS>Plant/...
CKMLAVR603
Routing plan data of plan order &1 incomplete
What causes this issue? The task list data for planned order &v1& (BOM, task list or production version) is not contained in the order and co...
CKMLAVR604
Routing plan data of production order &1 incomplete
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.