Do you have any question about this error?
Message type: E = Error
Message class: CK2 - Product Costing Messages Part 2
Message number: 003
Message text: &1 material(s) in company code &2 excluded via selection list
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CK2003
- &1 material(s) in company code &2 excluded via selection list ?The SAP error message CK2003 indicates that certain materials have been excluded from processing in a specific company code due to the selection criteria set in the system. This typically occurs during the execution of a costing run or when trying to perform a cost estimate for materials.
Cause:
- Selection Criteria: The materials may have been excluded based on the selection criteria defined in the costing run or cost estimate. This could be due to specific settings in the selection list that filter out certain materials.
- Material Status: The materials might have a status that prevents them from being included in the costing process (e.g., blocked, inactive).
- Company Code Settings: The company code settings may not allow certain materials to be processed, possibly due to configuration or master data issues.
- Costing Variant: The costing variant used may not be set up to include these materials.
Solution:
- Review Selection Criteria: Check the selection criteria used in the costing run or cost estimate. Ensure that the materials you want to include are not being filtered out by the selection list.
- Check Material Status: Verify the status of the materials in question. If they are blocked or inactive, you may need to change their status to allow them to be included in the costing process.
- Company Code Configuration: Review the configuration settings for the company code to ensure that the materials are allowed to be processed. This may involve checking the material master data and ensuring that it is correctly set up for the relevant company code.
- Costing Variant Settings: Check the settings of the costing variant being used. Ensure that it is configured to include the materials you are trying to cost.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on the error message and its implications.
Related Information:
By following these steps, you should be able to identify the cause of the CK2003 error and take appropriate action to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CK2002
Costing terminated, as costing in plant & is locked
What causes this issue? The system determined during the costing that a material in plant &v1& is being costed.System Response You cannot co...
CK2001
Reference cost estimate master data differs for material &1 plant &2
What causes this issue? For material &v1& in plant &v2&, you have specified in the material master a special procurement key for prod...
CK2004
Component &1, plant &2 can only be calculated by order BOM cost estimate
<(>&<)>CAUSE<(>&<)> You are trying to estimate the cost of a BOM component of a sales document using transaction CK51...
CK2005
Closure date is after 2047
What causes this issue? The closure date specified is after 2047 and therefore no scheduling can be performed to calculate the quantities of the asse...
Click on this link to search all SAP messages.