Do you have any question about this error?
Message type: E = Error
Message class: CK2 - Product Costing Messages Part 2
Message number: 004
Message text: Component &1, plant &2 can only be calculated by order BOM cost estimate
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CK2004
- Component &1, plant &2 can only be calculated by order BOM cost estimate ?The SAP error message CK2004 indicates that the system is unable to calculate the cost for a specific component in a bill of materials (BOM) because it requires an order BOM cost estimate. This typically occurs in the context of product costing, particularly when dealing with production orders or cost estimates for materials.
Cause:
- Order BOM Requirement: The component in question is linked to an order BOM, which means that the cost calculation must be based on a specific production order rather than a standard BOM.
- Missing Cost Estimate: There may not be a valid cost estimate available for the order BOM, or the system is unable to find the necessary data to perform the calculation.
- Configuration Issues: There may be configuration settings in the costing variant or BOM settings that are not aligned with the requirements for order-based costing.
Solution:
- Create or Check Order BOM: Ensure that an order BOM exists for the production order you are trying to cost. If it does not exist, you may need to create one.
- Perform Cost Estimate: Execute a cost estimate for the production order. This can typically be done through transaction codes like CK11N (Create Cost Estimate with Quantity Structure) or CK40N (Create Cost Estimate).
- Check Costing Variant: Review the costing variant settings to ensure that they are configured to allow for order BOM costing. Make sure that the relevant settings for the costing type and valuation are correctly set up.
- Review Component Settings: Check the material master data for the component to ensure that it is correctly set up for costing and that it is linked to the appropriate BOM.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on how to handle order BOMs and costing in your version of SAP.
Related Information:
By following these steps, you should be able to resolve the CK2004 error and successfully calculate the costs associated with the specified component and plant.
Get instant SAP help. Start your 7-day free trial now.
CK2003
&1 material(s) in company code &2 excluded via selection list
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CK2002
Costing terminated, as costing in plant & is locked
What causes this issue? The system determined during the costing that a material in plant &v1& is being costed.System Response You cannot co...
CK2005
Closure date is after 2047
What causes this issue? The closure date specified is after 2047 and therefore no scheduling can be performed to calculate the quantities of the asse...
CK2006
&2 is not active for controlling area &1
What causes this issue? You would like to carry out a cost estimate or marking in valuation view &V2&. The system has determined that for the...
Click on this link to search all SAP messages.