Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 541
Message text: Number of cost estimates to be marked exceeds &
You are attempting to mark &V2& cost estimates online.
An online costing run involves locking cost estimates and material
master records. For this reason you can only mark a maximum of &V1&
cost estimates online.
Marking in the costing run is not carried out online.
Carry out marking for this costing run in the background.
Error message extract from SAP system. Copyright SAP SE.
CK541
- Number of cost estimates to be marked exceeds & ?The SAP error message CK541 indicates that the number of cost estimates that you are trying to mark exceeds the allowed limit set in the system. This typically occurs during the process of marking cost estimates in the Controlling (CO) module, particularly in the context of product costing.
Cause: The error is triggered when you attempt to mark more cost estimates than the system allows. This limit is defined in the configuration settings of the SAP system, and it can vary based on the specific business requirements and system settings.
Solution: To resolve the CK541 error, you can take the following steps: Check Configuration Settings: Review the configuration settings in the SAP system to determine the maximum number of cost estimates that can be marked at one time. This can usually be found in the Customizing settings under the Controlling module. Adjust the Limit: If the limit is too low for your business needs, you may need to
Get instant SAP help. Sign up for our Free Essentials Plan.
CK540
Error while locking: Release not allowed
What causes this issue? You are attempting to allow standard cost estimates to be released for posting period &v1& of fiscal year &v2&...
CK539
Marking database: Period &1 &2 locked by user &3
What causes this issue? The marking database is locked by user &v3& for the current posting period &v1& of fiscal year &v2&.S...
CK542
Release with valuation type & required for separate valuation
What causes this issue? You are using the split valuation method of materials. Therefore, a cost estimate must be released with valuation type &v...
CK543
No future standard cost estimate has been marked for material &1
What causes this issue? You are attempting to release the standard cost estimate of material &v1& for posting period &v2& of fiscal y...
Click on this link to search all SAP messages.