Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 540
Message text: Error while locking: Release not allowed
You are attempting to allow standard cost estimates to be released for
posting period &v1& of fiscal year &v2&.
The system cannot lock the marking database. Therefore, release cannot
be allowed.
Allow standard cost estimates to be released at a later time.
Error message extract from SAP system. Copyright SAP SE.
CK540
- Error while locking: Release not allowed ?The SAP error message CK540, which states "Error while locking: Release not allowed," typically occurs in the context of the Controlling (CO) module, particularly when dealing with cost object or cost center planning and release processes. This error indicates that there is an issue with the locking mechanism in SAP, which is used to prevent concurrent changes to data.
Causes of CK540 Error
Release Status: The error often arises when you attempt to release a plan or budget that is not in a status that allows for release. For example, if the planning version is set to "not released" or if the release process has already been completed for that version.
Locking Issues: The error can also occur if there are existing locks on the data you are trying to release. This can happen if another user or process is currently working on the same data.
Authorization Issues: Sometimes, the user may not have the necessary authorizations to perform the release action, leading to this error.
Configuration Issues: Incorrect configuration settings in the controlling area or planning version can also lead to this error.
Solutions to CK540 Error
Check Release Status: Verify the status of the planning version you are trying to release. Ensure that it is set to allow releases. You can do this by checking the planning version settings in the configuration.
Release the Planning Version: If the planning version is not released, you may need to release it first. This can typically be done through the transaction code related to planning version management.
Check for Locks: Use transaction code SM12 to check for any existing locks on the data. If you find locks that are preventing the release, you may need to wait for the other user to finish or, if appropriate, you can delete the lock entries (ensure you have the necessary authorizations to do this).
Review Authorizations: Ensure that your user profile has the necessary authorizations to perform the release action. You may need to consult with your SAP security team to verify your permissions.
Consult Configuration: If the issue persists, consult with your SAP configuration team to review the settings related to the controlling area and planning versions. They may need to adjust settings to allow for the release.
Check for System Notes: Sometimes, SAP releases notes or patches that address specific issues. Check the SAP Support Portal for any notes related to this error.
Related Information
If the problem persists after trying the above solutions, it may be beneficial to reach out to SAP support or your internal SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CK539
Marking database: Period &1 &2 locked by user &3
What causes this issue? The marking database is locked by user &v3& for the current posting period &v1& of fiscal year &v2&.S...
CK538
Posting period & & is in the past
What causes this issue? You are attempting to allow releasing in posting period &v1& of fiscal year &v2&. This is only possible for c...
CK541
Number of cost estimates to be marked exceeds &
What causes this issue? You are attempting to mark &V2& cost estimates online. An online costing run involves locking cost estimates and mate...
CK542
Release with valuation type & required for separate valuation
What causes this issue? You are using the split valuation method of materials. Therefore, a cost estimate must be released with valuation type &v...
Click on this link to search all SAP messages.