Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 398
Message text: Valuation strategy & ignored in costing
You are attempting to use valuation strategy &V1& to valuate material
&V2& in plant &V3&. This can only be done with material cost estimates.
The system will attempt to valuate the material with the next valuation
strategy defined in valuation variant &V4&.
In Customizing for Product Cost Controlling, remove valuation strategy
&V1& from the strategy sequence in valuation variant &V4&.
Error message extract from SAP system. Copyright SAP SE.
CK398
- Valuation strategy & ignored in costing ?The SAP error message CK398, which states "Valuation strategy & ignored in costing," typically occurs during the costing process in SAP, particularly when dealing with material valuation and costing runs. This error indicates that the valuation strategy defined for a material is not being applied as expected, which can lead to issues in the costing process.
Cause:
- Valuation Strategy Not Defined: The valuation strategy for the material may not be defined correctly in the material master or may not be compatible with the costing variant being used.
- Costing Variant Issues: The costing variant may not be set up to utilize the valuation strategy defined for the material.
- Material Master Settings: The material master record may have incorrect settings or missing information related to valuation.
- Costing Run Configuration: The configuration of the costing run may not align with the valuation strategy, leading to the strategy being ignored.
- Valuation Class Issues: The valuation class assigned to the material may not correspond to the expected valuation strategy.
Solution:
- Check Material Master: Review the material master record (transaction MM03) to ensure that the valuation strategy is correctly defined and that all necessary fields are filled out.
- Review Costing Variant: Check the costing variant settings (transaction OKKN) to ensure that it is configured to use the appropriate valuation strategy.
- Adjust Valuation Class: Ensure that the valuation class assigned to the material is correct and corresponds to the valuation strategy you intend to use.
- Costing Run Configuration: Verify the configuration of the costing run (transaction CK40N) to ensure that it is set up to consider the valuation strategy.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on how to configure valuation strategies and costing variants.
- Testing: After making changes, perform a test costing run to see if the error persists.
Related Information:
By following these steps, you should be able to identify the root cause of the CK398 error and implement the necessary changes to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
CK397
Invalid data combination occurred
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
CK396
Cost component split does not exist although costing header data present
What causes this issue? Inconsistency in the database. For the material &V1& in plant &V2&, the header of a cost estimate was found i...
CK399
Costing is not allowed for material/PPS status
What causes this issue? Material &V2& in plant &V3& has material status &V1&. The setting for this status is such that costin...
CK400
Material &1: No plant maintained for special procurement type
What causes this issue? The material master record of material &v1& contains a <DS:GLOS.special_procurement_type>special procurement ty...
Click on this link to search all SAP messages.