Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 400
Message text: Material &1: No plant maintained for special procurement type
The material master record of material &v1& contains a
<DS:GLOS.special_procurement_type>special procurement type</> in the
<ZH>Costing</> or <ZH>MRP 1</> views that is not assigned to a plant.
No cost estimate will be transferred.
In Customizing for Materials Management, you can assign this special
procurement type to a plant.
<DS:TRAN.OMD9>Change special procurement type</>
Error message extract from SAP system. Copyright SAP SE.
CK400
- Material &1: No plant maintained for special procurement type ?The SAP error message CK400 indicates that there is an issue with the material configuration in relation to special procurement types. Specifically, it means that the system cannot find a plant associated with the specified special procurement type for the material in question.
Cause: Missing Plant Assignment: The material does not have a plant assigned for the specified special procurement type. Incorrect Special Procurement Type: The special procurement type may not be correctly defined or may not be applicable for the material. Master Data Issues: There may be issues with the material master data, such as missing or incomplete information.
Configuration Issues: The configuration settings for special procurement types may not be set up correctly in the system.
Solution: Check Material Master Data: Go to the material master record (transaction code MM03) and check if the plant is assigned for the relevant special procurement type. Ensure that the plant is correctly maintained in the material master for the relevant
Get instant SAP help. Sign up for our Free Essentials Plan.
CK399
Costing is not allowed for material/PPS status
What causes this issue? Material &V2& in plant &V3& has material status &V1&. The setting for this status is such that costin...
CK398
Valuation strategy & ignored in costing
What causes this issue? You are attempting to use valuation strategy &V1& to valuate material &V2& in plant &V3&. This can on...
CK401
Material &1: Plant &2 not found for special procurement type
What causes this issue? The material master record of material &v1& contains a <DS:GLOS.special_procurement_type>special procurement ty...
CK402
Material &1 plant &2 could not be found
What causes this issue? The system could not find material &v1& in plant &v2&.System Response No costing data could be transferred.H...
Click on this link to search all SAP messages.