Do you have any question about this error?
Message type: E = Error
Message class: CK - Product Costing Messages
Message number: 194
Message text: Operation & / & has no work center
In the <DS:GLOS.routing>routing</> for material &V1& in plant &V2&, the
<DS:GLOS.work_center>work center</> in <DS:GLOS.operation>operation</>
&V1& or sub-operation &V2& is missing.
The system cannot calculate the <DS:GLOS.planned_costs>planned costs</>
for the operation.
Enter a work center for operation &V1& or sub-operation &V2& in the
routing.
Error message extract from SAP system. Copyright SAP SE.
CK194
- Operation & / & has no work center ?The SAP error message CK194 indicates that a specific operation in a routing or production order does not have an associated work center. This can occur in various scenarios, such as when creating or processing production orders, or when performing cost calculations.
Cause:
- Missing Work Center: The operation in the routing does not have a work center assigned to it.
- Incorrect Routing: The routing may not be correctly defined, or the operation may have been deleted or not properly set up.
- Inactive Work Center: The work center assigned to the operation may be inactive or not available for the specified period.
- Configuration Issues: There may be issues with the configuration of the work center or routing in the system.
Solution:
Check Routing:
- Go to the routing transaction (e.g., CA03) and check the specific routing for the material in question.
- Ensure that each operation has a valid work center assigned.
Assign Work Center:
- If the operation is missing a work center, you can assign one by editing the routing.
- Make sure to save the changes after assigning the work center.
Verify Work Center Status:
- Check the work center (transaction CR01 or CR02) to ensure it is active and properly configured.
- Ensure that the work center is valid for the plant and the relevant time period.
Check for Deletions:
- If the operation was recently deleted or modified, ensure that the changes are correctly reflected in the routing.
Consult Documentation:
- Review any relevant documentation or guidelines for setting up routings and work centers in your organization.
Testing:
- After making the necessary changes, test the process again to ensure that the error does not reoccur.
Related Information:
Transaction Codes:
SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
User Roles: Ensure that you have the necessary authorizations to make changes to routings and work centers.
Training: If you are unfamiliar with routing and work center configuration, consider seeking training or guidance from a knowledgeable colleague or SAP consultant.
By following these steps, you should be able to resolve the CK194 error and ensure that your operations are correctly linked to their respective work centers.
Get instant SAP help. Start your 7-day free trial now.
CK193
Material & in plant & w/o cost comp split: price acc to val strategy
What causes this issue? When valuating <DS:GLOS.material_component>material components</>, the system could not find a <DS:GLOS.cost_c...
CK192
Material & in plant & has no suitable cost component split
What causes this issue? The system is attempting to valuate material &v1& in plant &v2&. In the material master record of this materi...
CK195
Exception & occurred with material & plant &
What causes this issue? The system is attempting to create a material master record for material &V1& in plant &V2& so that it can ca...
CK196
No authorization for creating a material master record
What causes this issue? You are not authorized to create a material master record.How to fix this error? You have to acquire this authorization; ple...
Click on this link to search all SAP messages.