How To Fix CK193 - Material & in plant & w/o cost comp split: price acc to val strategy


CK193 - Overview

  • Message type: E = Error

  • Message class: CK - Product Costing Messages

  • Message number: 193

  • Message text: Material & in plant & w/o cost comp split: price acc to val strategy

  • Show details Hide details
  • What causes this issue?

    When valuating <DS:GLOS.material_component>material components</>,
    the system could not find a <DS:GLOS.cost_component_split>cost
    component split</> for &V1& in plant &V2&.
    Possible causes:
    The material has not been costed.
    The material has not been selected for the costing run.
    The BOM was changed after the selection or BOM explosion for the
    costing run was carried out, and the material now has a new low-level
    code.
    This is a configurable material and does not have a costing view in the
    material master.
    The default value for price control is not set in the material type.
    The material belongs to a recursive structure. With this material, the
    system begins the iterative costing of the cycle. You can check in the
    material overview of the cost estimate whether the material belongs to
    a cycle.

    System Response

    The material is valuated with the price determined through the
    <DS:GLOS.valuation_strategy>valuation strategy</>.

    How to fix this error?

    Check the log.
    Carry out selection and BOM explosion for the costing run again.
    If the material is a configured material, create a costing view in its
    master record.
    If the material belongs to a cycle, the message can be ignored because
    only the first iterative step is affected.
    &sys_admin&
    Go into Customizing for Logistics General and check the default value
    for price control in the material type for material &v1&.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CK193 - Material & in plant & w/o cost comp split: price acc to val strategy ?
    The SAP error message CK193 typically occurs during the costing process in the Controlling (CO) module, particularly when dealing with material valuation and cost component splits. This error indicates that there is an issue with the valuation strategy for the material in the specified plant, which is preventing the system from determining the correct price for the material.
    
    Cause: Valuation Strategy Not Defined: The valuation strategy for the material may not be defined correctly in the material master record. Costing Variant Issues: The costing variant used may not be configured properly to handle the valuation strategy. Missing Cost Component Structure: The cost component structure may not be set up correctly or may be missing for the material. Material Master Data Issues: There could be inconsistencies or missing data in the material master record, such as the valuation class or price control indicator. Plant-Specific Settings: The settings for the specific plant may not align with the requirements

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant