How To Fix CJ708 - Profit center was not created for entire period


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 708

  • Message text: Profit center was not created for entire period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ708 - Profit center was not created for entire period ?

    The SAP error message CJ708 indicates that a profit center has not been created for the entire period in question. This typically occurs in the context of project management and controlling, particularly when dealing with internal orders or projects that require profit center assignments.

    Cause:

    1. Missing Profit Center Assignment: The profit center for the project or internal order has not been defined for the entire fiscal year or the specific period in which transactions are being recorded.
    2. Period Closing: The period may have been closed in the controlling module, preventing any new profit center assignments from being made.
    3. Master Data Issues: The profit center master data may not be correctly set up or may be missing for the relevant time frame.
    4. Project Structure: The project structure may not have been properly defined, leading to gaps in profit center assignments.

    Solution:

    1. Check Profit Center Assignment:

      • Go to the project or internal order in question and verify the profit center assignment.
      • Ensure that the profit center is valid for the entire period you are trying to post to.
    2. Create or Update Profit Center:

      • If the profit center does not exist for the required period, you may need to create it or update the existing profit center assignment.
      • Use transaction code KE52 (Change Profit Center) or KE51 (Create Profit Center) to manage profit center assignments.
    3. Review Period Settings:

      • Check the period settings in the controlling module to ensure that the period is open for posting.
      • Use transaction code OB52 to review and adjust the posting periods if necessary.
    4. Consult Master Data:

      • Review the master data for the profit center to ensure it is correctly set up and active for the required fiscal year.
      • Use transaction code KE53 (Display Profit Center) to check the details.
    5. Project Structure Review:

      • Ensure that the project structure is correctly defined and that all necessary components have the appropriate profit center assignments.

    Related Information:

    • Transaction Codes:

      • CJ20N: Project Builder
      • CJ02: Change Project
      • CJ03: Display Project
      • KE51, KE52, KE53: Profit Center management
      • OB52: Open/Close Posting Periods
    • Documentation: Refer to SAP Help documentation for detailed information on profit center accounting and project management.

    • User Roles: Ensure that you have the necessary authorizations to make changes to profit center assignments and project structures.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in controlling and project management within SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author