How To Fix CJ706 - Currency copied from company code


CJ706 - Overview

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 706

  • Message text: Currency copied from company code

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ706 - Currency copied from company code ?
    The SAP error message CJ706 ("Currency copied from company code") typically occurs in the context of project management and controlling when you are trying to create or modify a project or a project-related object (like a WBS element) in SAP. This error indicates that the currency for the project is being copied from the company code, but there may be a mismatch or an issue with the currency settings.
    
    Cause: Currency Mismatch: The currency defined for the project or WBS element does not match the currency of the company code. Project Settings: The project may have been set up with a different currency than what is defined in the company code.
    Configuration Issues: There may be configuration issues in the project system or controlling settings that lead to this error.
    Solution: Check Project Currency: Verify the currency settings for the project or WBS element. Ensure that it matches the currency of the company code. You can do

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker