Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 618
Message text: No subsequent element exists
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CJ618
- No subsequent element exists ?The SAP error message CJ618 ("No subsequent element exists") typically occurs in the context of project management and controlling within SAP, particularly when dealing with project structures, WBS (Work Breakdown Structure) elements, or network activities. This error indicates that the system is unable to find a subsequent element in the project hierarchy or network that is expected for the operation you are trying to perform.
Causes:
- Missing Subsequent Element: The most common cause is that the subsequent WBS element or network activity that you are trying to reference does not exist or has not been created.
- Incorrect Project Structure: The project structure may not be set up correctly, leading to gaps in the hierarchy.
- Data Inconsistencies: There may be inconsistencies in the data, such as deleted or inactive elements that are still being referenced.
- Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or access the subsequent elements.
Solutions:
- Check Project Structure: Verify the project structure to ensure that all necessary WBS elements or network activities are created and correctly linked. You can do this by navigating to the project in the Project System (PS) module and reviewing the hierarchy.
- Create Missing Elements: If you find that a subsequent element is indeed missing, create it as needed. Ensure that it is properly linked to the preceding elements.
- Review Data Consistency: Use transaction codes like CJ20N (Project Builder) or CJ03 (Display WBS) to check for any inconsistencies in the project data. You may need to run consistency checks or reports to identify issues.
- Check Authorizations: Ensure that you have the necessary authorizations to access the elements in question. If you suspect authorization issues, consult with your SAP security team.
- Consult Documentation: Review SAP documentation or help resources for specific guidance related to the error message and the context in which it occurs.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to reach out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CJ617
No previous element exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ616
Line cannot be selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ619
No. of project sections does not agree with project mask "&"
What causes this issue? You have entered the key for the project definition in a different form than it was defined.System Response INCLUDE 'NA...
CJ620
Project number or WBS number may not be used
What causes this issue? The key you entered for a project definition or WBS element is not valid according to the settings in Customizing.System Resp...
Click on this link to search all SAP messages.