Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 571
Message text: No actual dates could be determined for WBS element &
You cannot copy.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CJ571
- No actual dates could be determined for WBS element & ?The SAP error message CJ571 ("No actual dates could be determined for WBS element &") typically occurs in the context of project management within SAP, particularly when dealing with Work Breakdown Structure (WBS) elements. This error indicates that the system is unable to determine actual dates for a specific WBS element, which can hinder project tracking and reporting.
Causes:
- Missing Actual Data: There may be no actual costs or actual work recorded against the WBS element, which prevents the system from calculating actual dates.
- Incorrect Settings: The configuration settings for the project or WBS element may not be set up correctly, leading to issues in date determination.
- Status of WBS Element: The WBS element might be in a status that does not allow for actual postings (e.g., it could be locked or closed).
- Data Consistency Issues: There may be inconsistencies in the data related to the WBS element, such as missing or incorrect assignments of activities or resources.
- Project Structure Changes: If there have been recent changes to the project structure, such as moving or deleting WBS elements, it may affect the ability to determine actual dates.
Solutions:
- Check Actual Data: Ensure that there are actual costs or actual work recorded against the WBS element. You can do this by reviewing the project’s actual postings.
- Review WBS Element Status: Check the status of the WBS element to ensure it is open and available for postings.
- Configuration Review: Verify the configuration settings for the project and WBS elements to ensure they are set up correctly.
- Data Consistency Check: Perform a consistency check on the project data to identify any discrepancies or missing information.
- Re-evaluate Project Structure: If there have been changes to the project structure, ensure that all elements are correctly linked and that there are no orphaned elements.
- Use Transaction Codes: Utilize transaction codes like CJ20N (Project Builder) to review the WBS element and its associated activities and costs.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide deeper insights into the specific configuration and data setup in your SAP environment.
Get instant SAP help. Start your 7-day free trial now.
CJ570
No activities. Scheduling was not carried out.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ569
Project structure contains several calendars
What causes this issue? You have entered different factory calendars for the dates of the individual WBS elements. You could get dates for the WBS el...
CJ572
Subnetwork cannot be shown
What causes this issue? You selected an activity and want to show its dependent subnetwork.System Response The subnetwork for the selected activity ...
CJ573
Date conflicts exist. Check dates
What causes this issue? The system has discovered scheduling conflicts either when you saved your data or when you executed the function <PF>Ch...
Click on this link to search all SAP messages.