How To Fix CJ495 - WBS element & has no finish date. Scheduling not possible.


CJ495 - Overview

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 495

  • Message text: WBS element & has no finish date. Scheduling not possible.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ495 - WBS element & has no finish date. Scheduling not possible. ?
    The SAP error message CJ495 indicates that a Work Breakdown Structure (WBS) element does not have a finish date, which prevents scheduling from being performed. This error typically arises in project management scenarios within SAP, particularly when using the Project System (PS) module.
    
    Cause: Missing Finish Date: The primary cause of this error is that the WBS element in question has not been assigned a finish date. This is essential for scheduling activities and determining the timeline of the project. Incorrect Settings: The project settings or parameters may not be configured correctly, leading to the absence of a finish date. Incomplete Project Definition: The project may not be fully defined, meaning that certain required fields, including the finish date, are left blank.
    Solution: Assign a Finish Date: Navigate to the WBS element in question using transaction code CJ02 (Change WBS Element). Ensure that the finish date is filled in the relevant field. You can set a finish date

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker