Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 495
Message text: WBS element & has no finish date. Scheduling not possible.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CJ495
- WBS element & has no finish date. Scheduling not possible. ?The SAP error message CJ495 indicates that a Work Breakdown Structure (WBS) element does not have a finish date, which prevents scheduling from being performed. This error typically arises in project management scenarios within SAP, particularly when using the Project System (PS) module.
Cause:
- Missing Finish Date: The primary cause of this error is that the WBS element in question has not been assigned a finish date. This is essential for scheduling activities and determining the timeline of the project.
- Incorrect Settings: The project settings or parameters may not be configured correctly, leading to the absence of a finish date.
- Incomplete Project Definition: The project may not be fully defined, meaning that certain required fields, including the finish date, are left blank.
Solution:
Assign a Finish Date:
- Navigate to the WBS element in question using transaction code CJ02 (Change WBS Element).
- Ensure that the finish date is filled in the relevant field. You can set a finish date based on the project timeline and requirements.
Check Project Definition:
- Review the overall project definition to ensure that all necessary fields are completed. This includes start dates, finish dates, and any other relevant scheduling parameters.
Review Scheduling Parameters:
- Check the scheduling parameters for the project. Ensure that the project is set up to allow for scheduling and that all necessary settings are correctly configured.
Use Transaction Codes:
- Use transaction codes like CJ20N (Project Builder) to view and edit the project structure and ensure that all elements are correctly defined.
Consult Documentation:
- Refer to SAP documentation or help resources for additional guidance on project scheduling and WBS element configuration.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the Project System module for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CJ494
WBS element & has no start date. Scheduling not possible.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ493
You cannot insert dates in this mode
What causes this issue? You have selected a mode in project planning board in which you cannot insert a time bar.System Response INCLUDE 'NA_AL...
CJ496
You cannot insert lines in the table area
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ497
Several sets of dates selected: You cannot insert a time bar
What causes this issue? You have selected several sets of dates. You must select only one set of dates, for example, basic dates, to be able to inser...
Click on this link to search all SAP messages.