Stop Googling SAP errors. Use our Free Essentials plan instead - instant AI help, no credit card needed. Start Now

Close

How To Fix CJ177 - Capacity calculation was activated and takes place from next scheduling


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 177

  • Message text: Capacity calculation was activated and takes place from next scheduling

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ177 - Capacity calculation was activated and takes place from next scheduling ?

    The SAP error message CJ177 indicates that capacity calculation has been activated for a project, but it will only take effect from the next scheduling run. This message typically arises in the context of project management and scheduling within SAP, particularly when dealing with project systems (PS) and capacity planning.

    Cause:

    1. Capacity Calculation Activation: The error occurs when the capacity calculation feature is enabled for a project, but the current scheduling run does not include this calculation. This can happen if the project was recently configured to include capacity calculations, but the scheduling process has already been initiated.
    2. Scheduling Settings: The scheduling settings may not have been updated to reflect the new capacity calculation settings, leading to this message.
    3. Project Status: The project may be in a status that does not allow for immediate recalculation of capacities.

    Solution:

    1. Run Next Scheduling: The simplest solution is to wait for the next scheduling run. The capacity calculation will be applied during that run.
    2. Manual Scheduling: If immediate results are needed, you can manually trigger a scheduling run for the project. This can typically be done through transaction codes like CJ20N (Project Builder) or CJ02 (Change Project).
    3. Check Project Settings: Ensure that the project settings are correctly configured to allow for capacity calculations. This includes checking the project profile and ensuring that the capacity planning options are enabled.
    4. Review Capacity Planning Configuration: If the issue persists, review the overall capacity planning configuration in the system to ensure that it aligns with your project requirements.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific details on capacity calculation settings and scheduling processes.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ02 (Change Project), and C223 (Maintain Capacity Planning).
    • SAP Notes: Check for any SAP Notes related to capacity calculation and scheduling that may provide additional insights or fixes.
    • User Roles and Authorizations: Ensure that you have the necessary authorizations to perform scheduling and capacity calculations in the project system.
    • Training and Support: If you are new to SAP Project Systems, consider seeking training or support from experienced users or SAP consultants.

    By following these steps, you should be able to address the CJ177 error message and ensure that capacity calculations are effectively integrated into your project scheduling processes.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author