Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 169
Message text: WBS element is displayed by number
In the project profile settings WBS elements are referred to by their
short ID or description. However this transaction refers to WBS
elements using their number
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CJ169
- WBS element is displayed by number ?The SAP error message CJ169 indicates that a Work Breakdown Structure (WBS) element is being displayed by its number rather than its description. This can occur in various scenarios, particularly when working with project management and controlling modules in SAP.
Cause:
- Display Settings: The system may be configured to show WBS elements by their number instead of their description. This can happen due to user-specific settings or system-wide configurations.
- Data Issues: There may be issues with the data in the WBS element, such as missing descriptions or incorrect settings in the project definition.
- Authorization Issues: Sometimes, the user may not have the necessary authorizations to view the descriptions of the WBS elements.
Solution:
Check User Settings:
- Go to the user profile settings and check if there are any display options that can be adjusted to show descriptions instead of numbers.
Review WBS Element Data:
- Navigate to the WBS element in question and ensure that it has a valid description. You can do this by using transaction code CJ03 (Display WBS Element) and checking the details.
Authorization Check:
- Ensure that the user has the necessary authorizations to view the WBS element descriptions. This may involve checking roles and authorizations in transaction code PFCG.
System Configuration:
- If the issue persists, it may be necessary to check the system configuration settings related to project management. This may require assistance from a system administrator or SAP consultant.
SAP Notes:
- Check for any relevant SAP Notes that may address this specific issue. Sometimes, there are known bugs or configuration settings that can be adjusted.
Related Information:
If the problem continues after trying the above solutions, it may be beneficial to consult with your SAP support team or an SAP consultant for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
CJ168
Activities in network "&" are assigned to several WBS elements
What causes this issue? You want check the availability of a material via the WBS element. The system checks material availability using the network ...
CJ167
Activity dates are not within WBS dates
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ170
Not all of the fields in the field selection are displayed
What causes this issue? You have selected fields which cannot be displayed in the table area of the project planning board. This is the case for all ...
CJ171
Your relationship's predecessor or successor is not an activity
What causes this issue? You want to create a relationship between two project objects. However, at least one of these objects is not an activity.Syst...