How To Fix CJ167 - Activity dates are not within WBS dates


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 167

  • Message text: Activity dates are not within WBS dates

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ167 - Activity dates are not within WBS dates ?
    The SAP error message CJ167 ("Activity dates are not within WBS dates") typically occurs when you are trying to assign or change the dates of an activity in a project that fall outside the defined dates of the Work Breakdown Structure (WBS) element. This is a common issue in project management within SAP, particularly in the Project System (PS) module.
    
    Cause: Date Mismatch: The start or finish dates of the activity you are trying to create or modify are outside the start and finish dates of the associated WBS element. WBS Element Configuration: The WBS element may have been configured with specific start and end dates that do not accommodate the activity's dates. Project Planning Changes: Changes in project planning or scheduling that have not been reflected in the WBS dates can lead to this error.
    Solution: To resolve the CJ167 error, you can take the following steps: Check WBS Dates: Navigate to the WBS element in question

    Already have an account? Login here!


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker