How To Fix CJ150 - No dates set. Scheduling could not be carried out


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 150

  • Message text: No dates set. Scheduling could not be carried out

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CJ150 - No dates set. Scheduling could not be carried out ?
    The SAP error message CJ150 "No dates set. Scheduling could not be carried out" typically occurs in the context of project management and scheduling within SAP, particularly when dealing with project definitions, work breakdown structures (WBS), or network activities. This error indicates that the system cannot perform scheduling because there are no valid dates set for the project or its components.
    Causes:
    
    Missing Start/Finish Dates: The project or activity does not have defined start or finish dates.
    Incomplete Project Definition: The project or WBS element may not be fully defined, leading to missing scheduling parameters.
    Incorrect Status: The project or WBS element might be in a status that does not allow scheduling (e.g., locked or not released).
    Dependencies Not Defined: If there are dependencies between activities that are not properly defined, it can lead to scheduling issues.
    Missing Planning Data: Required planning data (like duration, work, etc.) may not be entered.
    
    Solutions:
    
    Set Dates: Ensure that the start

    Already have an account? Login here!


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author