Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 150
Message text: No dates set. Scheduling could not be carried out
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CJ150
- No dates set. Scheduling could not be carried out ?The SAP error message CJ150 "No dates set. Scheduling could not be carried out" typically occurs in the context of project management and scheduling within SAP, particularly when dealing with project definitions, work breakdown structures (WBS), or network activities. This error indicates that the system cannot perform scheduling because there are no valid dates set for the project or its components.
Causes:
- Missing Start/Finish Dates: The project or activity does not have defined start or finish dates.
- Incomplete Project Definition: The project or WBS element may not be fully defined, leading to missing scheduling parameters.
- Incorrect Status: The project or WBS element might be in a status that does not allow scheduling (e.g., locked or not released).
- Dependencies Not Defined: If there are dependencies between activities that are not properly defined, it can lead to scheduling issues.
- Missing Planning Data: Required planning data (like duration, work, etc.) may not be entered.
Solutions:
- Set Dates: Ensure that the start and finish dates are set for the project or WBS element. You can do this in the project definition or WBS element screen.
- Check Project Status: Verify that the project is in a status that allows scheduling. If it is locked or not released, you may need to change its status.
- Complete Project Definition: Make sure that all necessary fields in the project definition or WBS element are filled out correctly.
- Define Dependencies: If there are activities that depend on each other, ensure that these dependencies are properly defined in the network.
- Enter Planning Data: Make sure that all required planning data, such as duration and work, is entered for the activities involved.
Related Information:
By addressing the above points, you should be able to resolve the CJ150 error and successfully carry out scheduling in your SAP system.
Get instant SAP help. Sign up for our Free Essentials Plan.
CJ149
Planned values calculated -> See reports
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ148
No costs were calculated for any WBS element
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ151
No confirmations for WBS element "&" exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ152
Reconcile the milestone date with that of the WBS element
What causes this issue? You entered a date for the milestone which is not within the date interval of the WBS element &V1& to which the miles...