Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 149
Message text: Planned values calculated -> See reports
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CJ149
- Planned values calculated -> See reports ?The SAP error message CJ149 ("Planned values calculated -> See reports") typically occurs in the context of project management and controlling within SAP, particularly when dealing with project planning and budgeting in the Project System (PS) module. This message indicates that the planned values for a project or a work breakdown structure (WBS) element have been calculated, but there may be issues or discrepancies that need to be addressed.
Cause:
- Data Inconsistencies: There may be inconsistencies in the data entered for the project, such as incorrect or missing information in the WBS elements, network activities, or cost elements.
- Planning Versions: The planning version being used may not be correctly set or may not match the version expected by the system.
- Locked Data: The data may be locked for editing due to ongoing processes or approvals, preventing updates to planned values.
- Missing Master Data: Required master data (like cost centers, internal orders, etc.) may be missing or incorrectly configured.
- Calculation Errors: There may be errors in the calculation logic or formulas used to derive planned values.
Solution:
- Check Reports: The error message suggests checking relevant reports. Use transaction codes like CJ20N (Project Builder) or S_ALR_87013558 (Project Planning Overview) to review the project data and planned values.
- Review Planning Data: Ensure that all necessary planning data is entered correctly. Check the WBS elements, network activities, and any associated cost elements for accuracy.
- Verify Planning Versions: Make sure that the correct planning version is being used and that it is active.
- Unlock Data: If the data is locked, coordinate with the relevant team members to unlock it or wait until the lock is released.
- Check Master Data: Ensure that all required master data is available and correctly configured in the system.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the error and its context.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in SAP Project System.
Get instant SAP help. Sign up for our Free Essentials Plan.
CJ148
No costs were calculated for any WBS element
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ147
Not all activities can be costed for WBS element &
What causes this issue? You do not have authorization to change activities. In this situation the costs will only be calculated for the WBS element. ...
CJ150
No dates set. Scheduling could not be carried out
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CJ151
No confirmations for WBS element "&" exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...