Do you have any question about this error?
Message type: E = Error
Message class: CJ - Project master data and structure
Message number: 053
Message text: WBS element has not been assigned a billing plan
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message CJ053 indicates that a Work Breakdown Structure (WBS) element has not been assigned a billing plan. This error typically occurs in the context of project management and controlling within SAP, particularly when trying to create or process billing documents for projects.
Cause:
The primary cause of this error is that the WBS element you are trying to bill does not have a billing plan associated with it. A billing plan is necessary for determining how and when billing should occur for the project or service associated with the WBS element.
Solution:
To resolve the CJ053 error, you need to assign a billing plan to the relevant WBS element. Here are the steps to do this:
Access the WBS Element:
- Go to the transaction code CJ02 (Change Project) or CJ20N (Project Builder).
- Enter the project definition and navigate to the specific WBS element that is causing the error.
Assign a Billing Plan:
- In the WBS element details, look for the "Billing" tab or section.
- Here, you can assign a billing plan. If a billing plan does not exist, you may need to create one.
- Ensure that the billing plan is correctly configured with the necessary billing milestones and conditions.
Check Billing Plan Configuration:
- If you need to create a new billing plan, you can do this in the transaction code CJ88 (Settlement) or through the project management settings.
- Make sure that the billing plan aligns with the project’s requirements and that all necessary data is filled out.
Save Changes:
- After assigning or creating the billing plan, save your changes.
Retry the Billing Process:
- Once the billing plan is assigned, try to process the billing document again to see if the error is resolved.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in project systems (PS) within SAP.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP error explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |
CJ052 WBS element & is not a billing element
What causes this issue? Because the WBS element &V1& is not defined as ...
CJ051 WBS element & is not an account assignment element
What causes this issue? Because the WBS element &V1& is not defined as ...
CJ054 You cannot maintain the settlement rule for WBS element
What causes this issue? The WBS element must be identified as an <GL:account...
CJ055 WBS element & has an account assignment and cannot be deleted
What causes this issue? You cannot delete WBS element &V1&. It has depe...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.