How To Fix CF205 - There are no PRT allocations to sub-operations.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CF - PRT management messages

  • Message number: 205

  • Message text: There are no PRT allocations to sub-operations.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CF205 - There are no PRT allocations to sub-operations. ?

    The SAP error message CF205, "There are no PRT allocations to sub-operations," typically occurs in the context of production planning and control when trying to assign or manage Production Resources/Tools (PRT) in a production order or operation. Here’s a breakdown of the cause, potential solutions, and related information:

    Cause:

    1. Missing PRT Allocation: The error indicates that there are no PRTs allocated to the specific sub-operation in the production order. This can happen if the PRTs were not assigned during the planning phase or if they were removed inadvertently.
    2. Incorrect Configuration: The configuration settings for PRTs in the system may not be set up correctly, leading to issues in allocation.
    3. Sub-operation Settings: The sub-operation itself may not have been defined to allow for PRT allocation, or it may not be linked to any PRTs in the system.
    4. Order Status: The production order may be in a status that does not allow for PRT allocation (e.g., if the order is already completed or technically closed).

    Solution:

    1. Check PRT Allocation:

      • Go to the production order in question and check the operations and sub-operations.
      • Ensure that the required PRTs are allocated to the relevant sub-operation. You can do this by navigating to the operation details and checking the PRT tab.
    2. Assign PRTs:

      • If no PRTs are assigned, you can add them manually. Go to the operation details, select the PRT tab, and add the necessary PRTs.
    3. Review Configuration:

      • Check the configuration settings for PRTs in the system. Ensure that the PRTs are correctly defined and that the necessary settings are in place to allow for their allocation to operations.
    4. Check Sub-operation Settings:

      • Verify that the sub-operation is set up correctly to allow for PRT allocation. This may involve checking the routing and ensuring that the sub-operation is linked to the correct PRTs.
    5. Order Status:

      • Ensure that the production order is in a status that allows for PRT allocation. If the order is completed or closed, you may need to reopen it or create a new order.

    Related Information:

    • Transaction Codes: You may use transaction codes like CO02 (Change Production Order) or CO03 (Display Production Order) to manage production orders and check PRT allocations.
    • Documentation: Refer to SAP documentation or help files for detailed instructions on managing PRTs and production orders.
    • User Roles and Permissions: Ensure that you have the necessary permissions to make changes to production orders and PRT allocations.

    If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or refer to SAP Notes for any known issues or patches related to this error message.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker