Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CBP036 - The MRP type is not used as a filter since BOM is not exploded


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CBP - Message class for CBP

  • Message number: 036

  • Message text: The MRP type is not used as a filter since BOM is not exploded

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CBP036 - The MRP type is not used as a filter since BOM is not exploded ?

    The SAP error message CBP036 indicates that the Material Requirements Planning (MRP) type is not being used as a filter because the Bill of Materials (BOM) for the material in question has not been exploded. This typically occurs during the planning process when the system is trying to determine the requirements for a material but cannot do so because it lacks the necessary BOM information.

    Cause:

    1. BOM Not Maintained: The most common cause is that the BOM for the material has not been created or is not valid.
    2. BOM Not Active: The BOM might exist but is not active for the relevant plant or production version.
    3. MRP Type Configuration: The MRP type assigned to the material may not be configured correctly to handle the BOM explosion.
    4. Material Status: The material might be set to a status that prevents it from being planned (e.g., "Blocked" or "Inactive").
    5. Planning Parameters: The planning parameters for the material may not be set correctly, leading to issues in the MRP run.

    Solution:

    1. Check BOM: Verify if a BOM exists for the material in question. You can do this using transaction code CS03 (Display BOM).

      • If no BOM exists, create one using transaction code CS01 (Create BOM).
      • If a BOM exists but is not active, ensure it is activated for the relevant plant and production version.
    2. Review MRP Type: Check the MRP type assigned to the material using transaction code MM03 (Display Material).

      • Ensure that the MRP type is appropriate for the material and that it is configured to allow BOM explosion.
    3. Material Status: Check the material status to ensure it is not blocked or inactive. You can do this in the material master record.

    4. Run MRP Again: After making the necessary changes, run the MRP process again to see if the error persists.

    5. Check Planning Parameters: Review the planning parameters for the material to ensure they are set correctly. This includes checking the MRP views in the material master.

    Related Information:

    • Transaction Codes:
      • CS03: Display BOM
      • CS01: Create BOM
      • MM03: Display Material
      • MD01: MRP Run
    • MRP Types: Familiarize yourself with different MRP types and their configurations in the system.
    • BOM Structure: Understand the structure of BOMs and how they relate to MRP processes.
    • SAP Documentation: Refer to SAP Help documentation for detailed information on MRP and BOM management.

    By following these steps, you should be able to resolve the CBP036 error and ensure that the MRP process can utilize the BOM for planning purposes.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker