Message type: E = Error
Message class: CB - PP-PI-PMA: Dialog Messages for Process Management
Message number: 510
Message text: No reservation matching message data found
In the selected process message, material consumption data is
transferred to the destination &V1&. When the goods issue was posted,
a reservation could not be assigned for one of the following reasons:
No reservation matching the message data could be found.
The combination of the message data "order number", "operation number",
"material number", "reservation number" and "reservation item" is not
consistent.
As no reservation could be assigned, an unplanned goods issue was posted
for the order.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CB510
- No reservation matching message data found ?The SAP error message CB510 "No reservation matching message data found" typically occurs in the context of the SAP system when dealing with material management, particularly in the areas of production planning or inventory management. This error indicates that the system could not find a reservation that matches the criteria specified in the message data. Causes: Missing Reservation: The most common cause is that there is no reservation created for the material or the specific requirements you are trying to process. Incorrect Data Entry: The data entered in the transaction might not match any existing reservations. This could be due to incorrect material numbers, plant codes, or other relevant fields. Reservation Deletion: The reservation might have been deleted or not yet created at the time of processing. Authorization Issues: Sometimes, the user may not have the necessary authorizations to view or access the reservations. System Configuration: There may be configuration issues in the system that prevent
Get instant SAP help. Sign up for our Free Essentials Plan.
CB509
Operation & does not exist in order &
What causes this issue? In the selected process message, operation &V1& is specified for order &V2&. However, opration &V1& ...
CB508
Enter "X" or " " as final issue indicator
What causes this issue? In the selected process message, material consumption data is transferred to the destination &V1& (address COCI_CONFI...
CB511
Operation or phase status & is not defined in the system
What causes this issue? With the selected process message, the operation or phase status &V1& is reported to the destination &V2& (ad...
CB512
Message is sent to address & using asynchronous RFC
What causes this issue? The selected process message is sent to the address &V1& via a transactional remote function call (tRFC). The tRFC en...
Click on this link to search all SAP messages.