Do you have any question about this error?
Message type: E = Error
Message class: C7 - Scheduling
Message number: 146
Message text: There is no operation for scheduling
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C7146
- There is no operation for scheduling ?The SAP error message C7146, "There is no operation for scheduling," typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that the system cannot find any operations that can be scheduled for a particular order or task. Here are some potential causes, solutions, and related information for this error:
Causes:
Missing Operations: The production order or process order may not have any operations defined. This can happen if the order was created incorrectly or if the routing is not properly assigned.
Incorrect Status: The order may be in a status that does not allow scheduling, such as "TECO" (Technically Completed) or "CLOSE".
Routing Issues: The routing associated with the order may not be valid or may not contain any operations.
Capacity Constraints: If there are no available resources or capacity in the work center, the system may not find any operations to schedule.
Order Type Configuration: The configuration of the order type may not allow for scheduling operations.
Solutions:
Check Operations: Verify that the production or process order has operations defined. You can do this by checking the routing assigned to the order.
Review Order Status: Ensure that the order is in a status that allows scheduling. If the order is in a closed or completed status, you may need to reopen it or create a new order.
Validate Routing: Check the routing for the order to ensure it is valid and contains the necessary operations. You can do this by navigating to the routing transaction (e.g., CA03) and reviewing the details.
Check Work Center Capacity: Ensure that the work centers associated with the operations have available capacity. You can check this in the capacity planning transaction (e.g., CM01).
Order Type Settings: Review the configuration of the order type in the customizing settings to ensure that it allows for scheduling operations.
Recreate the Order: If the order is corrupted or incorrectly set up, consider deleting and recreating the order with the correct parameters.
Related Information:
Transaction Codes: Familiarize yourself with relevant transaction codes such as CO02 (Change Production Order), CO03 (Display Production Order), CA03 (Display Routing), and CM01 (Capacity Planning).
SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message. You can search the SAP Support Portal for updates or patches.
Documentation: Review SAP documentation related to production planning and scheduling for best practices and troubleshooting steps.
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Start your 7-day free trial now.
C7145
Dates do not exist in the forecast dates
What causes this issue? You want to carry out WBS scheduling using forecast dates. There is an external relationship to activity &v1& in netw...
C7144
WBS element/project scheduling: No date has been entered
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C8001
Fill the first status line
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C8002
Data was saved
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.