How To Fix C7144 - WBS element/project scheduling: No date has been entered


SAP Error Message - Details

  • Message type: E = Error

  • Message class: C7 - Scheduling

  • Message number: 144

  • Message text: WBS element/project scheduling: No date has been entered

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message C7144 - WBS element/project scheduling: No date has been entered ?

    The SAP error message C7144, which states "WBS element/project scheduling: No date has been entered," typically occurs when you are trying to schedule a project or a Work Breakdown Structure (WBS) element without having specified the necessary dates. This can happen in various scenarios, such as when creating or updating a project in SAP Project System (PS).

    Cause:

    1. Missing Dates: The most common cause of this error is that the start date or finish date for the WBS element or project has not been entered.
    2. Incorrect Configuration: There may be configuration issues in the project settings that prevent dates from being set or recognized.
    3. Incomplete Data Entry: The user may have skipped entering required fields during the creation or modification of the project or WBS element.

    Solution:

    To resolve the C7144 error, you can take the following steps:

    1. Enter Dates:

      • Go to the project or WBS element in question.
      • Ensure that you have entered both the start date and finish date in the relevant fields.
      • If you are using a project template, make sure that the template has the necessary date fields filled out.
    2. Check Project Settings:

      • Verify the project settings to ensure that the scheduling parameters are correctly configured.
      • Check if the project type allows for scheduling and if there are any restrictions on date entries.
    3. Review Dependencies:

      • If the WBS element is dependent on other elements or milestones, ensure that those dependencies are correctly set up and that their dates are also entered.
    4. Use Transaction Codes:

      • You can use transaction codes like CJ20N (Project Builder) or CJ02 (Change Project) to access the project and check the date fields.
    5. Consult Documentation:

      • If you are unsure about the required fields or settings, refer to the SAP documentation or help files related to Project System (PS) for guidance.
    6. User Authorization:

      • Ensure that you have the necessary authorizations to make changes to the project or WBS element.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that might address this specific error or provide additional troubleshooting steps.
    • Project Management Best Practices: Familiarize yourself with best practices in project management within SAP to avoid similar issues in the future.
    • Training: Consider training sessions or workshops on SAP Project System to enhance your understanding of project scheduling and management.

    By following these steps, you should be able to resolve the C7144 error and successfully enter the necessary dates for your WBS element or project.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker