How To Fix C7142 - error while reading capacities with splits


SAP Error Message - Details

  • Message type: E = Error

  • Message class: C7 - Scheduling

  • Message number: 142

  • Message text: error while reading capacities with splits

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message C7142 - error while reading capacities with splits ?

    The SAP error message C7142 typically occurs in the context of capacity planning and production scheduling within the SAP system, particularly when dealing with capacity evaluations that involve splits. This error indicates that there is an issue with reading capacities that have been split across different resources or time periods.

    Cause of Error C7142

    The error can arise due to several reasons, including:

    1. Incorrect Configuration: The configuration of the capacity planning settings may not be set up correctly, leading to issues when the system attempts to read split capacities.

    2. Data Inconsistencies: There may be inconsistencies in the data related to capacity planning, such as missing or incorrect entries in the capacity master records.

    3. Resource Availability: The resources being evaluated may not be available or may have been incorrectly defined, leading to issues when the system tries to read their capacities.

    4. Time Period Issues: The time periods for which the capacities are being evaluated may not align correctly, causing the system to fail when attempting to read the split capacities.

    Solution to Error C7142

    To resolve the C7142 error, you can take the following steps:

    1. Check Configuration: Review the configuration settings for capacity planning and ensure that all relevant parameters are set correctly. This includes checking the settings for split capacities.

    2. Validate Data: Perform a thorough check of the capacity master records and ensure that all necessary data is complete and accurate. Look for any missing entries or inconsistencies.

    3. Resource Definition: Verify that the resources involved in the capacity evaluation are correctly defined and available. Ensure that they are not locked or inactive.

    4. Time Period Alignment: Ensure that the time periods for which you are trying to read capacities are correctly aligned and that there are no overlaps or gaps that could cause issues.

    5. Check Logs: Review the system logs for any additional error messages or warnings that may provide more context about the issue.

    6. Consult Documentation: Refer to SAP documentation or notes related to capacity planning and error C7142 for any specific guidance or patches that may be applicable.

    7. Contact SAP Support: If the issue persists after trying the above steps, consider reaching out to SAP support for further assistance. They may have additional insights or solutions based on the specific configuration and version of your SAP system.

    Related Information

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide updates and patches.
    • Capacity Planning Documentation: Review SAP's official documentation on capacity planning and scheduling for best practices and troubleshooting tips.
    • Community Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to identify and resolve the underlying cause of the C7142 error in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author