How To Fix C7142 - error while reading capacities with splits


C7142 - Overview

  • Message type: E = Error

  • Message class: C7 - Scheduling

  • Message number: 142

  • Message text: error while reading capacities with splits

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message C7142 - error while reading capacities with splits ?
    The SAP error message C7142 typically occurs in the context of capacity planning and production scheduling within the SAP system, particularly when dealing with capacity evaluations that involve splits. This error indicates that there is an issue with reading capacities that have been split across different resources or time periods.
    Cause of Error C7142
    The error can arise due to several reasons, including:
    
    
    Incorrect Configuration: The configuration of the capacity planning settings may not be set up correctly, leading to issues when the system attempts to read split capacities.
    
    
    Data Inconsistencies: There may be inconsistencies in the data related to capacity planning, such as missing or incorrect entries in the capacity master records.
    
    
    Resource Availability: The resources being evaluated may not be available or may have been incorrectly defined, leading to issues when the system tries to read their capacities.
    
    
    Time Period Issues: The time periods for which the capacities are being evaluated may not align

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant