Message type: E = Error
Message class: C7 - Scheduling
Message number: 078
Message text: WBS element &: Forwards scheduling is not possible without a start date
The WBS element is not scheduled.
Enter a basic start date in at least one of the objects mentioned
above.
Network scheduling:
Enter a basic start date in at least one network header.
Error message extract from SAP system. Copyright SAP SE.
C7078
- WBS element &: Forwards scheduling is not possible without a start date ?The SAP error message C7078 indicates that a Work Breakdown Structure (WBS) element is missing a start date, which is necessary for forwards scheduling. This error typically arises in project management scenarios where scheduling is dependent on defined dates for tasks or elements.
Cause: Missing Start Date: The primary cause of this error is that the WBS element does not have a defined start date. Forwards scheduling requires a starting point to calculate the subsequent dates for tasks. Incorrect Configuration: There may be configuration issues in the project management settings that prevent the assignment of a start date. Data Entry Errors: During the creation or modification of the WBS element, the start date may not have been entered or saved correctly.
Solution: Define a Start Date: Navigate to the WBS element in question. Ensure that a valid start date is entered in the relevant fields. This can typically be done in the project definition or WBS element details. Save
Get instant SAP help. Sign up for our Free Essentials Plan.
C7077
Overall netw. sched.: No conflicts between basic and scheduled dates
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7076
Overall network scheduling: Basic start is after scheduled start
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7079
WBS element &: Backwards scheduling is not possible without a finish date
CAUSE& You want to backward schedule a WBS element, although a basic finish date has not been entered in either the projection definition, WBS el...
C7080
Program CX_TCX00 executed successfully
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.