Message type: E = Error
Message class: C7 - Scheduling
Message number: 077
Message text: Overall netw. sched.: No conflicts between basic and scheduled dates
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C7077
- Overall netw. sched.: No conflicts between basic and scheduled dates ?The SAP error message C7077, which states "Overall netw. sched.: No conflicts between basic and scheduled dates," typically occurs in the context of project management and scheduling within SAP. This error indicates that there is a discrepancy between the basic dates (the planned dates) and the scheduled dates (the dates that have been calculated based on the current project status).
Cause:
- Date Conflicts: The basic dates and scheduled dates for a task or activity in a project do not align. This can happen if the basic dates are set incorrectly or if there have been changes in the project that have not been reflected in the basic dates.
- Network Scheduling Issues: The network scheduling might not have been updated properly after changes were made to the project, leading to inconsistencies.
- Dependencies and Constraints: There may be dependencies or constraints that are causing the scheduled dates to differ from the basic dates.
Solution:
- Check Basic and Scheduled Dates: Review the basic and scheduled dates for the affected task or activity. Ensure that they are set correctly and that there are no discrepancies.
- Recalculate Dates: Use the scheduling functions in SAP to recalculate the dates. This can often resolve conflicts by updating the scheduled dates based on the current project status.
- Review Dependencies: Check for any dependencies or constraints that may be affecting the scheduling. Adjust them if necessary to ensure that the dates align.
- Update Project Plan: If there have been changes to the project plan, ensure that all relevant dates are updated accordingly. This may involve adjusting the basic dates to match the new project timeline.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling scheduling errors and conflicts.
Related Information:
CJ20N
(Project Builder) or CN41
(Network Overview) to manage and review project schedules.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
C7076
Overall network scheduling: Basic start is after scheduled start
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7075
Overall network scheduling: Basic finish date before scheduled finish
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C7078
WBS element &: Forwards scheduling is not possible without a start date
CAUSE& You want to forward schedule a WBS element, although a basic start date has not been entered in either the projection definition, WBS elem...
C7079
WBS element &: Backwards scheduling is not possible without a finish date
CAUSE& You want to backward schedule a WBS element, although a basic finish date has not been entered in either the projection definition, WBS el...
Click on this link to search all SAP messages.