Message type: E = Error
Message class: C5 - Master Recipe
Message number: 615
Message text: The "from" lot size must not exceed the "to" lot size
The "to" lot size must always be greater than the "from" lot size.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Please change the lot size.
Error message extract from SAP system. Copyright SAP SE.
C5615
- The "from" lot size must not exceed the "to" lot size ?The SAP error message C5615, which states "The 'from' lot size must not exceed the 'to' lot size," typically occurs in the context of production planning or material requirements planning (MRP) when dealing with lot sizes in a production order or a similar transaction. This error indicates that the specified lot size for a production order or a planned order is not valid because the "from" lot size exceeds the "to" lot size defined in the system.
Cause: Lot Size Configuration: The error usually arises from incorrect configuration of lot sizes in the material master or in the production order. The "from" lot size is the minimum quantity that can be produced, while the "to" lot size is the maximum quantity that can be produced in a single run. Order Quantity: The quantity specified in the production order or planned order may be outside the defined lot size range. Master Data Issues: There may
Get instant SAP help. Sign up for our Free Essentials Plan.
C5614
Check BOM alternative proposal
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C5613
Lot size of production version does not match BOM alternative
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
C5616
The "to" date is in the past
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
C5617
Run schedule headers with a different validity exist for production vers.
What causes this issue? You want to change the validity period of a production version that is used in a run schedule header.System Response The sys...
Click on this link to search all SAP messages.