Do you have any question about this error?
Message type: E = Error
Message class: C5 - Master Recipe
Message number: 615
Message text: The "from" lot size must not exceed the "to" lot size
The "to" lot size must always be greater than the "from" lot size.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Please change the lot size.
Error message extract from SAP system. Copyright SAP SE.
C5615
- The "from" lot size must not exceed the "to" lot size ?The SAP error message C5615, which states "The 'from' lot size must not exceed the 'to' lot size," typically occurs in the context of production planning or material requirements planning (MRP) when dealing with lot sizes in a production order or a similar transaction. This error indicates that the specified lot size for a production order or a planned order is not valid because the "from" lot size exceeds the "to" lot size defined in the system.
Cause:
- Lot Size Configuration: The error usually arises from incorrect configuration of lot sizes in the material master or in the production order. The "from" lot size is the minimum quantity that can be produced, while the "to" lot size is the maximum quantity that can be produced in a single run.
- Order Quantity: The quantity specified in the production order or planned order may be outside the defined lot size range.
- Master Data Issues: There may be inconsistencies or errors in the material master data, particularly in the lot size settings.
Solution:
Check Lot Size Settings:
- Go to the material master record (transaction code MM03) and check the lot size settings under the relevant views (e.g., MRP view).
- Ensure that the "from" lot size is less than or equal to the "to" lot size.
Adjust Order Quantity:
- Review the production order or planned order quantity. Make sure that the quantity falls within the defined lot size range.
- If necessary, adjust the order quantity to comply with the lot size constraints.
Review Production Version:
- If applicable, check the production version associated with the material. Ensure that the lot size settings in the production version are correct.
Consult with Configuration Team:
- If you are unsure about the correct lot size settings, consult with your SAP configuration team or a functional consultant who can help you review and adjust the settings as needed.
Testing:
- After making the necessary adjustments, try to create or modify the production order again to see if the error persists.
Related Information:
By following these steps, you should be able to resolve the C5615 error and ensure that your lot size settings are correctly configured in SAP.
Get instant SAP help. Start your 7-day free trial now.
C5614
Check BOM alternative proposal
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C5613
Lot size of production version does not match BOM alternative
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
C5616
The "to" date is in the past
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
C5617
Run schedule headers with a different validity exist for production vers.
What causes this issue? You want to change the validity period of a production version that is used in a run schedule header.System Response The sys...