Do you have any question about this error?
Message type: E = Error
Message class: BT - Background processing messages
Message number: 616
Message text: Internal communication error at program scheduling (see system log)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BT616
- Internal communication error at program scheduling (see system log) ?The SAP error message BT616, which indicates an "Internal communication error at program scheduling," typically arises during the execution of background jobs or when scheduling tasks in the SAP system. This error can be caused by various factors, including system configuration issues, communication problems between different SAP components, or resource limitations.
Causes:
- Network Issues: Problems with network connectivity between application servers can lead to communication errors.
- System Resource Limitations: Insufficient memory or CPU resources can cause the job scheduling process to fail.
- Configuration Errors: Incorrect settings in the background processing configuration or job scheduling parameters.
- Database Issues: Problems with the database connection or performance can also lead to this error.
- Transport Layer Issues: Issues in the transport layer that affect communication between different SAP instances.
- Locks or Deadlocks: If a job is trying to access a resource that is locked by another process, it may result in this error.
Solutions:
- Check System Logs: Review the system logs (transaction SM21) for more detailed error messages that can provide insights into the root cause.
- Monitor Background Jobs: Use transaction SM37 to check the status of background jobs and identify any that are failing or in a waiting state.
- Review Configuration: Ensure that the background processing configuration is set up correctly. Check transaction SM36 for job scheduling settings.
- Check Network Connectivity: Verify that all application servers are properly connected and that there are no network issues.
- Resource Monitoring: Monitor system resources (CPU, memory, etc.) using transaction ST06 or ST02 to ensure that the system is not overloaded.
- Database Performance: Check the database performance and ensure that it is running optimally. Use transaction DB02 for database monitoring.
- Restart Services: If the issue persists, consider restarting the affected application server or the entire SAP system to clear any temporary issues.
- SAP Notes: Search for relevant SAP Notes in the SAP Support Portal that may address this specific error or provide patches.
Related Information:
Transaction Codes:
SAP Support: If the issue cannot be resolved with the above steps, consider reaching out to SAP Support for further assistance, providing them with detailed logs and error messages.
Documentation: Review SAP documentation related to background processing and job scheduling for best practices and troubleshooting steps.
By following these steps, you should be able to diagnose and resolve the BT616 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
BT615
Internal communication error at program start (see system log)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BT614
External program was canceled
What causes this issue? The external program was cancelled on the target host. The preceding message gives the precise reason.System Response The jo...
BT617
External communication error at program start (see system log)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BT618
External communication error at program scheduling (see system log)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.