Message type: E = Error
Message class: BP - Budgeting and planning
Message number: 751
Message text: Availability control is &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BP751
- Availability control is & ?The SAP error message BP751, which states "Availability control is &," typically relates to issues with budget availability control in the SAP system. This error can occur in various modules, particularly in Controlling (CO) and Project System (PS), when there are problems with budget checks or availability control settings.
Cause: Budget Not Defined: The budget for the specified cost center, internal order, or project may not be defined or may have been exceeded. Availability Control Settings: The settings for availability control may not be properly configured in the system. Document Type Issues: The document type being used may not be allowed for the specific availability control settings. Incorrect Configuration: There may be incorrect configuration in the controlling area or the budget structure. Status of the Budget: The budget may be in a status that does not allow further postings (e.g., closed or locked).
Solution: Check Budget Definition: Ensure that the budget is defined for the relevant cost center,
Get instant SAP help. Sign up for our Free Essentials Plan.
BP750
Availability control for: &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BP749
Availability control in &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BP752
Check against first BS element with budget
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
BP753
Check against first budget object
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
Click on this link to search all SAP messages.