Do you have any question about this error?
Message type: E = Error
Message class: BP - Budgeting and planning
Message number: 710
Message text: *-----Continuation availability control: Messages 710 - 799 reserved
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BP710
- *-----Continuation availability control: Messages 710 - 799 reserved ?The SAP error message BP710, which falls under the category of "Continuation availability control," indicates that there is an issue related to the availability control settings in the system. This error typically arises when there are problems with budget availability checks or when the system is unable to process a transaction due to budget constraints.
Cause:
- Budget Availability Control Settings: The error may occur if the budget availability control settings are not properly configured for the relevant budget or commitment item.
- Insufficient Budget: The transaction you are trying to execute may exceed the available budget, leading to a failure in the availability check.
- Incorrect Configuration: There may be incorrect settings in the controlling area or the budget structure that prevent the system from processing the transaction.
- Document Type Issues: The document type used for the transaction may not be allowed for the specific budget or availability control settings.
Solution:
- Check Budget Availability: Verify the budget availability for the relevant commitment item or cost center. Ensure that there is sufficient budget to cover the transaction.
- Review Configuration: Check the configuration settings for availability control in the SAP system. This includes reviewing the settings in the controlling area and ensuring that the budget structure is correctly defined.
- Adjust Document Type Settings: If the document type is causing the issue, review the settings for that document type in the configuration and ensure it is allowed for the relevant budget.
- Consult with Finance Team: If you are unsure about the budget settings or how to adjust them, consult with your finance or controlling team for assistance.
- Transaction Codes: Use transaction codes like
S_ALR_87013611
(for budget reports) orKP06
(for planning) to analyze the budget situation and make necessary adjustments.Related Information:
If the problem persists after following these steps, it may be necessary to involve your SAP support team or consult with SAP directly for further assistance.
Get instant SAP help. Start your 7-day free trial now.
BP701
No organizational unit determined for the concept sought
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BP700
Enter a valid organizational unit
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BP711
& & commitment budget exceeded
What causes this issue? Commitment budget &V3& in &V1& has been exceeded by &V4&.Error message extract from SAP system. Copyr...
BP712
& commitment budget for year & exceeded
What causes this issue? In &V1&, commitment budget &V3& for fiscal year &V2& was exceeded by &V4&.Error message extra...
Click on this link to search all SAP messages.