How To Fix BP068 - Overall cost element planning not possible


BP068 - Overview

  • Message type: E = Error

  • Message class: BP - Budgeting and planning

  • Message number: 068

  • Message text: Overall cost element planning not possible

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message BP068 - Overall cost element planning not possible ?
    The SAP error message BP068 ("Overall cost element planning not possible") typically occurs in the context of planning activities within the SAP system, particularly when dealing with cost elements in controlling (CO) or financial planning. This error indicates that there is an issue with the planning process for a specific cost element.
    Causes of BP068 Error
    
    
    Missing Cost Element: The cost element you are trying to plan may not be defined in the system or may not be available for planning in the current context.
    
    
    Incorrect Planning Version: The planning version you are using may not be set up correctly or may not allow for planning on the specified cost element.
    
    
    Planning Layout Issues: The planning layout may not include the cost element you are trying to plan, or it may not be configured correctly.
    
    
    Authorization Issues: The user may not have the necessary authorizations to perform planning activities on the specified cost element.
    
    
    Data Locking:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:
  • BP067 You must not use version &
    What causes this issue? Version &V1& is not intended for cost planning or flagged as a delta version.System Response Processing stopped.How ...

  • BP066 Lines entered were flagged
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • BP069 There are no values for display
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • BP070 For & &, availability control is &
    What causes this issue? The following criteria must be satisfied before availability control can be activated: There must be at least one active entr...

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author