Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: BOS04 - BOS PS integration and Futher objects with EN language
Message number: 098
Message text: Changes to the cost estimate should be done in ECP
Additions or deductions are assigned to the Easy cost planning .
System will not allow to do any changes to the costing line items on the
mass change screen after the addition and deductions are added.
Any changes to the Cost estimate should be carried out in the ECP
screen.
Error message extract from SAP system. Copyright SAP SE.
BOS04098
- Changes to the cost estimate should be done in ECP ?The SAP error message BOS04098, which states "Changes to the cost estimate should be done in ECP," typically occurs in the context of cost estimation and controlling within SAP systems. This error indicates that the system is enforcing a policy or configuration that requires any changes to cost estimates to be made in the Enterprise Controlling (ECP) module rather than in the traditional controlling (CO) module.
Cause:
- Configuration Settings: The system may be configured to restrict changes to cost estimates in certain modules, directing users to make those changes in ECP.
- Version Control: The cost estimate may be locked or in a version that does not allow changes outside of ECP.
- User Authorization: The user may not have the necessary authorizations to make changes in the current module.
- Data Integrity: The system is designed to maintain data integrity by ensuring that cost estimates are managed in a centralized manner through ECP.
Solution:
- Access ECP: Navigate to the Enterprise Controlling module and make the necessary changes to the cost estimate there.
- Check Configuration: Review the configuration settings in the controlling area to ensure that they align with your organization's policies regarding cost estimates.
- User Roles and Authorizations: Ensure that the user has the appropriate roles and authorizations to make changes in ECP.
- Consult Documentation: Refer to SAP documentation or your organization's SAP support team for specific guidelines on how to manage cost estimates in ECP.
- Training: If users are unfamiliar with ECP, consider providing training or resources to help them understand how to navigate and make changes in that module.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who specializes in SAP controlling and ECP.
Get instant SAP help. Sign up for our Free Essentials Plan.
BOS04097
Save the Cost estimate by saving the Sales Document.
What causes this issue? Additions or deductions are assigned to the Easy cost planning for the cost estimation of the service line .System Response ...
BOS04096
MECP Call failed, contact SAP Support
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BOS04099
Transaction is obsolete
What causes this issue? Transaction is obsoleteSystem Response The Cost Transfer to Project is obsolete. The transactions BOSPS01, BOSPS02 and BOSPS...
BP000
*-----Messages 001 to 498 reserved for general messages
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.