Message type: E = Error
Message class: BORRT - Messages for regular routes
Message number: 063
Message text: Schedule &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BORRT063
- Schedule & ?The SAP error message BORRT063 typically relates to issues with scheduling in the SAP system, particularly in the context of production planning or project management. The message "Schedule &" indicates that there is a problem with the scheduling of a particular task or operation.
Cause:
The error can be caused by several factors, including but not limited to:
- Missing Data: Required data for scheduling (like dates, resources, or dependencies) may be missing or incorrectly configured.
- Resource Conflicts: There may be conflicts with resource availability, such as over-allocation or unavailability of required resources.
- Incorrect Parameters: Scheduling parameters or settings may not be correctly defined in the system.
- System Configuration Issues: There may be issues with the configuration of the scheduling module in SAP.
- Dependencies: There may be unresolved dependencies between tasks or operations that prevent proper scheduling.
Solution:
To resolve the BORRT063 error, you can take the following steps:
- Check Scheduling Data: Review the scheduling data for the task or operation in question. Ensure that all required fields are filled out correctly.
- Resource Availability: Verify the availability of resources and check for any conflicts. Adjust resource allocations if necessary.
- Review Parameters: Check the scheduling parameters and settings in the system to ensure they are configured correctly.
- Dependency Resolution: Look for any dependencies that may not be resolved and address them accordingly.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the scheduling module you are using.
- System Logs: Check system logs for any additional error messages or warnings that may provide more context about the issue.
- Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting with SAP experts for further assistance.
Related Information:
CO02
for production orders or CJ20N
for project management.By following these steps, you should be able to identify and resolve the underlying cause of the BORRT063 error message in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
BORRT062
Initializing shipment: Log from &1, &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BORRT061
No GR defined for several selected schedules at &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BORRT064
Route schedule in this variant is not initial
What causes this issue? You normally maintain variants for inbound shipments at this point. A variant that includes a route schedule is intended for ...
BORRT065
Route schedule & in shipment does not match route schedule of the variant
What causes this issue? A route schedule is entered in the selection variant and the shipment. Only shipping notifications belonging to the same rout...
Click on this link to search all SAP messages.