How To Fix BOM630 - Customer exit: explosion date &1 is before BOM creation date &2.


BOM630 - Overview

  • Message type: E = Error

  • Message class: BOM - BOMs (2)

  • Message number: 630

  • Message text: Customer exit: explosion date &1 is before BOM creation date &2.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message BOM630 - Customer exit: explosion date &1 is before BOM creation date &2. ?
    The SAP error message BOM630 indicates that there is a discrepancy between the explosion date of a Bill of Materials (BOM) and the creation date of that BOM. Specifically, the explosion date (the date when the BOM is being processed or exploded for production planning) is earlier than the BOM creation date. This situation is not valid because the system expects the BOM to be available before it can be exploded for production.
    
    Cause: Incorrect Dates: The explosion date you are trying to use is set to a date that is earlier than the date the BOM was created. Data Entry Error: There may have been a mistake in entering the dates during the BOM creation or during the planning process. BOM Changes: If the BOM was created or modified after the explosion date was set, it could lead to this error.
    Solution: Check Dates: Verify the explosion date and the BOM creation date. Ensure that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker