How To Fix BOM631 - Customer exit: explosion date &1, BOM creation date &2.


BOM631 - Overview

  • Message type: E = Error

  • Message class: BOM - BOMs (2)

  • Message number: 631

  • Message text: Customer exit: explosion date &1, BOM creation date &2.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message BOM631 - Customer exit: explosion date &1, BOM creation date &2. ?
    The SAP error message BOM631 typically occurs in the context of Bill of Materials (BOM) processing. This error indicates a mismatch between the explosion date and the BOM creation date. Specifically, it suggests that the system is trying to explode a BOM for a date that is either before the BOM was created or not valid for the specified date.
    
    Cause: Date Mismatch: The explosion date (the date for which the BOM is being processed) is earlier than the BOM creation date. This means that the BOM does not exist for the requested explosion date. BOM Validity: The BOM may have specific validity dates set, and the explosion date falls outside of these dates.
    Configuration Issues: There may be configuration settings in the BOM or material master that are causing this issue.
    Solution: Check BOM Dates: Verify the creation date of the BOM and ensure that the explosion date is on or after this date. You

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author