Do you have any question about this error?
Message type: E = Error
Message class: BK - Create, Display, Reverse Controlling Document
Message number: 124
Message text: System cannot determine run schedule for material &/version & on &
The system could not find a run schedule header on the posting date for
the combination of material &V1&/production version &V2& that you
specified.
This means that more than one run schedule header was created for this
combination of material/production version in whose runtime the posting
date lies.
Processing is stopped.
Enter another combination of material/production version for which only
one run schedule header has been created on posting date &V3& or
correct your entry.
Error message extract from SAP system. Copyright SAP SE.
BK124
- System cannot determine run schedule for material &/version & on & ?The SAP error message BK124 indicates that the system is unable to determine the run schedule for a specific material and version on a given date. This error typically occurs in the context of production planning and scheduling, particularly when dealing with materials that have specific production or planning requirements.
Causes:
- Missing Master Data: The material master data or the production version may not be properly maintained. This includes missing or incorrect data in the material master, bill of materials (BOM), or routing.
- No Valid Production Version: The system may not find a valid production version for the material on the specified date. This can happen if the production version is not valid for the date in question.
- Scheduling Parameters: The scheduling parameters for the material may not be set correctly, leading to issues in determining the run schedule.
- Capacity Constraints: There may be capacity constraints in the production planning that prevent the system from scheduling the run.
- Planning Strategy: The planning strategy assigned to the material may not be appropriate for the current planning scenario.
Solutions:
- Check Material Master Data: Verify that the material master data is complete and accurate. Ensure that the production version is correctly assigned and valid for the required date.
- Review Production Versions: Check the production versions for the material to ensure they are set up correctly and are valid for the date in question.
- Adjust Scheduling Parameters: Review and adjust the scheduling parameters in the material master or in the production planning settings to ensure they align with the requirements.
- Check Capacity Planning: Review the capacity planning settings to ensure that there are no constraints that would prevent scheduling. This includes checking work centers and available capacity.
- Examine Planning Strategy: Ensure that the planning strategy assigned to the material is appropriate for the production process and aligns with the overall planning objectives.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Start your 7-day free trial now.
BK123
No run schedule exists for material &/version & on &
What causes this issue? No run schedule exists for the material &V1&/production version &V2& combination on posting date &V3&...
BK122
Run schedule & has not been created
What causes this issue? Run schedule &V1& does not exist in the SAP System.System Response Processing is terminated.How to fix this error? ...
BK125
Posting date is not within validity period of run schedule &
What causes this issue? You can only post run schedule headers if the posting date falls within its validity period. Posting date &V2& of th...
BK126
Run schedule & is not created for material &/production version &
What causes this issue? Run schedule &V1& does not belong to the material &V2&/production version &V3& combination.System Res...
Click on this link to search all SAP messages.