How To Fix BK126 - Run schedule & is not created for material &/production version &


BK126 - Overview

  • Message type: E = Error

  • Message class: BK - Create, Display, Reverse Controlling Document

  • Message number: 126

  • Message text: Run schedule & is not created for material &/production version &

  • Show details Hide details
  • What causes this issue?

    Run schedule &V1& does not belong to the material &V2&/production
    version &V3& combination.

    System Response

    If you enter both a run schedule and a material/production version
    combination, the SAP System checks whether the run schedule also
    belongs to this production version.
    If you enter either a run schedule or a material/production version
    combination only, the SAP System automatically fills the fields left
    blank.

    How to fix this error?

    Enter a different run schedule or a different material/production
    version combination, so that the run schedule belongs to the production
    version.
    Alternately, delete one or both entries.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message BK126 - Run schedule & is not created for material &/production version & ?
    The SAP error message BK126 typically indicates that a run schedule for a specific material and production version could not be created. This error can arise in the context of production planning and scheduling, particularly when dealing with production orders or run schedules in SAP.
    Causes of Error BK126
    
    
    Missing Master Data: The material or production version may not be properly defined in the system. This includes missing or incorrect data in the material master or production version settings.
    
    
    Incorrect Configuration: The configuration settings for the production process may not be set up correctly. This can include settings in the routing, work center, or production version.
    
    
    Capacity Issues: There may be insufficient capacity in the work center to accommodate the production schedule.
    
    
    Scheduling Parameters: The scheduling parameters for the material or production version may not be set correctly, leading to issues in creating the run schedule.
    
    
    Status of the Material: The material may be in a

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker