Message type: E = Error
Message class: BE - General document entry
Message number: 401
Message text: Item &: cost element & does not agree with the reservation
Item &V1& entered in cost element &V2& must agree with cost element
&V3& in the reservation.
Processing stopped.
Error message extract from SAP system. Copyright SAP SE.
BE401
- Item &: cost element & does not agree with the reservation ?The SAP error message BE401 indicates a discrepancy between the cost element specified in a reservation and the cost element that is expected or required for the transaction. This error typically arises during the processing of reservations, particularly in the context of materials management or production planning.
Cause: Cost Element Mismatch: The cost element defined in the reservation does not match the cost element that is configured in the system for the relevant account assignment.
Configuration Issues: There may be configuration issues in the controlling area or the cost element accounting settings. Data Entry Errors: Incorrect data entry when creating or modifying the reservation can lead to this error. Master Data Issues: The material master or other related master data may not be set up correctly, leading to inconsistencies.
Solution: Check Reservation Details: Review the reservation to ensure that the cost element is correctly specified. You can do this by navigating to the reservation document and checking
Get instant SAP help. Sign up for our Free Essentials Plan.
BE400
* 401 - 499: Reserved for reducing funds reservations using actual pstgs
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BE310
Document & contains no items relevant to clearing
What causes this issue? Possible reasons: All items are complete No items existSystem Response Processing stoppedHow to fix this error? The system ...
BE402
Transaction currency & does not agree with reservation currency &
What causes this issue? The current transaction currency &V1& does not agree with the currency in reservation &V3&. The reservation c...
BE403
Item &: account assignment does not agree with the reservation
What causes this issue? Account assignment &V2& must agree with the account assignment in the reservation.System Response Processing stopped...
Click on this link to search all SAP messages.