Do you have any question about this error?
Message type: E = Error
Message class: BA - Data Archiving
Message number: 310
Message text: Following action &1, action &2 is not possible in the same program
The current program (normally run as a job) contains an invalid
sequence of actions: After an action of type &V1& (WRI = write job, DEL
= delete job...; see domain ADMI_JOB_T), the system tried to carry out
an action of type &V2&.
For example, a delete program must not call function module
<EX>ARCHIVE_OPEN_FOR_READ </>after calling <EX>ARCHIVE_OPEN_FOR_DELETE
</> (However, the sequence REA -> DEL is allowed).</>
The program or the job was terminated.
If the terminated program is a customer-specific program, avoid invalid
sequences. If this is a standard SAP program, report this programming
error to SAP.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
BA310
- Following action &1, action &2 is not possible in the same program ?The SAP error message BA310 indicates that there is a conflict in the execution of actions within a program. Specifically, it states that after performing action &1, action &2 cannot be executed in the same program context. This typically occurs in scenarios where certain actions are mutually exclusive or where the program's state does not allow for the second action to be executed after the first.
Cause:
- Mutually Exclusive Actions: The actions being attempted are designed to be executed separately. For example, if one action modifies data in a way that makes it incompatible with the subsequent action.
- Program Logic: The program may have been designed with specific logic that prevents certain actions from being executed in sequence.
- Transaction Control: The error may arise from the way transactions are managed within the program, where certain actions require a commit or rollback before another action can be initiated.
Solution:
- Review Program Logic: Check the program code to understand the sequence of actions being executed. Ensure that the actions are not being called in a conflicting manner.
- Modify Action Sequence: If possible, rearrange the order of actions so that they do not conflict. Ensure that the first action is fully completed before attempting the second.
- Check for Commit/Rollback: If the actions involve database changes, ensure that a commit or rollback is performed after the first action before attempting the second.
- Consult Documentation: Review the SAP documentation or help files related to the specific actions to understand any constraints or requirements.
- Debugging: Use debugging tools to step through the program and identify where the conflict arises. This can help pinpoint the exact cause of the error.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to reach out to SAP support for further assistance, providing them with detailed information about the actions being performed and the context in which the error occurs.
Get instant SAP help. Start your 7-day free trial now.
BA309
Jobs of type &1 cannot be released
What causes this issue? Job management could not release any data archivng jobs of type &V1&, (WRI = write job, DEL = delete job...; see doma...
BA308
Jobs of type &1 cannot be released
What causes this issue? Job management could not release any data archiving jobs of type &V1& (WRI= write job, DEL= delete job... ; see domai...
BA311
Interruption request was not processed
What causes this issue? The system received an interruption request for the current write program. However, the program was unable to process the re...
BA312
Write job &1 scheduled with ID &2
System Response Write job &V1& (ID number &V2&) was successfully scheduled by the current submit job &V3& (ID &V4&).E...
Click on this link to search all SAP messages.